SHANGHAI, Sept. 5 (SMM) - Peru’s government plans to solicit bid for Michiquillay Cu-Mo-Au-Ag project with investment of $2 billion on November 16, BNAmericas reported.
The project is located in Cajamarca, covering 4,050 hectares. Its copper reserves total 1.16 million tonnes based on the 0.4% cutoff grade, with average grade of 0.629%.
Phosphor Copper Price Rises Remarkably, Here's Why, SMM Reports
Designed beneficiation capacity is 80,000 tonnes per day, with copper output of 200,000 tonnes per annum.
BHP Billiton Olympic Dam Mine Successfully Yields First Copper Cathode with Dump Leaching Technology
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn