Home / Metal News / Copper / Zambia President Requires Glencore MCM to Accept New Electric Price
Zambia President Requires Glencore MCM to Accept New Electric Price
Aug 28,2017 11:13CST
industry newscompany news
Source:SMM
Zambian President Edgar Lungu’s spokesman said August 26 Glencore’s Mopani Copper Mines (MCM) has been required to accept new electric prices, foreign media reported.

SHANGHAI, Aug. 28 (SMM) - Zambian President Edgar Lungu’s spokesman said August 26 Glencore’s Mopani Copper Mines (MCM) has been required to accept new electric prices, foreign media reported.

The country has canceled subsidy for state-owned energy companies. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Glencore
copper ore output
copper mine
Mopani Copper Mines

For queries, please contact Frank LIU at liuxiaolei@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news