Home / Metal News / Ansteel Undertakes Maintenance at Medium Plate Production Line

Ansteel Undertakes Maintenance at Medium Plate Production Line

iconAug 7, 2017 10:24
Source:SMM
Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.

SHANGHAI, Aug. 7 (SMM) - Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.

Higher Profit Stimulates Hot-Rolled Coil Production, China Deepens “Ditiao Steel” Elimination Inspections

About 36,000 tonnes of medium plate output will be affected. 

Shandong Laigang to Undertake Near 4-Month Maintenance at Blast Furnace in September, SMM Reports

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Ansteel Group
steel

For queries, please contact William Gu at williamgu@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news
    timeFeb 22, 2022 15:05
    timeFeb 22, 2022 13:07
    timeFeb 22, 2022 12:00
    timeFeb 22, 2022 12:04
    timeFeb 22, 2022 11:57
    timeFeb 22, 2022 11:57
    timeFeb 22, 2022 11:48
    timeFeb 22, 2022 11:38
    timeFeb 22, 2022 11:10
    timeFeb 22, 2022 16:10

SMM Events & Webinars

All