SHANGHAI, Aug. 7 (SMM) - Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.
About 36,000 tonnes of medium plate output will be affected.
Shandong Laigang to Undertake Near 4-Month Maintenance at Blast Furnace in September, SMM Reports
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn