Ansteel Undertakes Maintenance at Medium Plate Production Line

Published: Aug 07, 2017 10:24 (GMT+8)
Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.

SHANGHAI, Aug. 7 (SMM) - Ansteel Group began maintenance at one 4,300 mm medium plate line on August 1, which will last for 12 days.

Higher Profit Stimulates Hot-Rolled Coil Production, China Deepens “Ditiao Steel” Elimination Inspections

About 36,000 tonnes of medium plate output will be affected. 

Shandong Laigang to Undertake Near 4-Month Maintenance at Blast Furnace in September, SMM Reports

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
Oct 08, 2026 16:26 (GMT+8)
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
Read More
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
[SMM Flash] According to customs data, in August 2026, China exported 29.696 million semi-steel tires (including retreaded tires), with cumulative exports from January to August totaling 235.7676 million units, down 0.92% YoY.
Oct 08, 2026 16:26 (GMT+8)
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Sep 28, 2026 17:34 (GMT+8)
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Read More
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
[Waste Lead-Acid Battery Market Update] Recently, the Heyuan Municipal Ecology and Environment Bureau issued the "Notice on Regulating the Management of Waste Lead-Acid Batteries." According to the Ecological Environment Code of the People's Republic of China, enterprises and public institutions that engage in the collection and storage of waste without a permit may be fined 200,000-1 million yuan; those that engage in utilization and disposal operations without a permit may be fined 1-5 million yuan and ordered to suspend operations or shut down, with responsible persons fined 100,000-1 million yuan; if the act constitutes a crime, criminal liability shall be pursued in accordance with the law.
Sep 28, 2026 17:34 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Sep 28, 2026 17:33 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Read More
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
[Market Dynamics of Waste Lead-Acid Batteries from E-bikes] Recently, the Guangzhou Municipal Ecology and Environment Bureau issued a notice on the key points for environmental management of waste lead-acid batteries from e-bikes in Guangzhou. The document clarifies that waste lead-acid batteries are hazardous waste (HW31, 900-52), and scrap batteries generated from store recycling, trade-in, and repair must be transferred to licensed units. Units holding a hazardous waste collection permit (including 900-52) are exempt from electronic transfer manifests during the collection process under the centralized collection pilot program.
Sep 28, 2026 17:33 (GMT+8)