World Largest Iron, Zinc Dust Processing Line Passes Acceptance Check

Published: Aug 04, 2017 10:17 (GMT+8)
The 300,000-tpy iron and zinc dust processing line passed acceptance check on August 2, according to cs.com.

SHANGHAI, Aug. 4 (SMM) - The 300,000-tpy iron and zinc dust processing line passed acceptance check on August 2, according to cs.com.

China Zinc Producer Sihuan Posts Sharp Rise in Profit in First Half on Technical Reform

The production line is built jointly by Shasteel and Beijing Shenwu Environment & Energy Technology Corp. 

Zinc Price Buoyant as One Large Chinese Zinc Smelter to Cut Output for Maintenance in August, SMM Reports

It realizes recycling of iron and zinc dust resources, and will helps push energy saving and emission reduction in domestic steel industry. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【SMM Flash News】Copper Lake Closes First Private Placement Tranche to Fund Marshall Lake Copper-Zinc Exploration.
13 hours ago
【SMM Flash News】Copper Lake Closes First Private Placement Tranche to Fund Marshall Lake Copper-Zinc Exploration.
Read More
【SMM Flash News】Copper Lake Closes First Private Placement Tranche to Fund Marshall Lake Copper-Zinc Exploration.
【SMM Flash News】Copper Lake Closes First Private Placement Tranche to Fund Marshall Lake Copper-Zinc Exploration.
Copper Lake Resources announced the closing of the first tranche of its non-brokered private placement, issuing 15,625,031 units at $0.15 each for gross proceeds of $2,343,755. Net proceeds will fund exploration at the Marshall Lake copper-zinc-silver-gold project in Ontario, Canada, and general working capital. The second and final tranche is expected to close by October 14. Completion of the private placement remains subject to all necessary regulatory approvals, including TSX Venture Exchange approval.
13 hours ago
BMC Minerals reports further expansion of polymetallic mineralisation at Rhyolite Peak
14 hours ago
BMC Minerals reports further expansion of polymetallic mineralisation at Rhyolite Peak
Read More
BMC Minerals reports further expansion of polymetallic mineralisation at Rhyolite Peak
BMC Minerals reports further expansion of polymetallic mineralisation at Rhyolite Peak
BMC Minerals reported on October 5 that polymetallic mineralisation at the Rhyolite Peak target within its Kudz Ze Kayah project in Yukon, Canada, had been further extended. Rhyolite Peak is a silver-zinc-gold-copper-lead exploration target located near the proposed ABM mine. The update remains an exploration-stage drilling development and does not constitute a new Mineral Resource, Ore Reserve or production change.
14 hours ago
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
14 hours ago
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
Read More
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
DOWA Holdings plans to produce 113,543 tonnes of zinc in H2 FY2026, up 27.0% from its H1 plan of 89,373 tonnes and 26.8% from the 89,525 tonnes produced in H2 FY2025. Its Akita Zinc operation uses the hematite process to recover indium and other valuable metals at high yields and integrates zinc smelting with rare-metal production and recycling. Higher planned zinc output may increase feed throughput for by-product indium recovery. However, DOWA disclosed no indium production target, and any supply increase will depend on feed grades, recovery rates and operating schedules rather than zinc volumes alone.
14 hours ago