SHFE Copper Finishes Lower (2017-8-3)

Published: Aug 3, 2017 16:55
SHFE 1710 copper, becoming the most actively traded one, opened at RMB 50,320/mt and closed at RMB 49,980/mt, down RMB 240/mt.

SHANGHAI, Aug. 3 (SMM) – On Thursday, SHFE 1710 copper, becoming the most actively traded one, opened at RMB 50,320/mt and dropped slightly. Later, the contract rallied to RMB 50,520/mt with longs entering, up to as high as RMB 50,590/mt. During the afternoon trading, SHFE 1710 copper slumped below RMB 50,000/mt and closed at RMB 49,980/mt, down RMB 240/mt. Positions increased 5,690 to 215,000 and trading volumes rose 29,148 to 187,000 lots. Positions of all SHFE copper contracts reduced 5,144 to 711,000. China’s Caixin service PMI was 51.5 in July, hitting lowest level from May 2016, and composite PMI registered a 4-month high at 51.9.

Attention should be on US’s initial jobless claim in the week ending July 28, and final reading of Markit service PMI on Thursday’s night trading.  

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
1 hour ago
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Read More
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Chile’s most pressing crisis at present is the issue of water resources. The Atacama Desert in Chile is one of the driest regions in the world and also the core area for copper and lithium ore extraction. The local area has experienced a drought for as long as 14 years, and reservoir storage has fallen to only about 30%. For miners, water resources are not a secondary issue, but an indispensable key production factor in such processes as ore processing, dust suppression, and equipment cooling. The decline in ore grade has further exacerbated the predicament
1 hour ago
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
1 hour ago
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
Read More
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
US President Trump adjusted the national security tariffs on imports of steel, aluminum, and copper, lowering the tariff rates on derivative products made from these metals, streamlining compliance procedures, and preventing the declared value of imports from being understated.A senior Trump administration official said that, under a proclamation signed by Trump, the US would continue to maintain a 50% import tariff on imports of metal commodities such as steel, aluminum, and copper pursuant to Section 232 of the Trade Act of 1974, but would apply this rate to the price paid by US consumers. It is currently unclear how the selling price—and the resulting tariffs—would be determined.
1 hour ago
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
1 hour ago
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Read More
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Barrick Mining said that its Reko Diq copper-gold project in Pakistan still plans to achieve first production by the end of 2028.The project is a large-scale copper-gold project jointly developed by Barrick, the Pakistani government, and relevant joint venture partners, and is located in Balochistan, Pakistan. Although the company had previously warned that the capital budget previously disclosed for the project's two phases could face a significant increase, the 2028 production commencement target remained unchanged.
1 hour ago
SHFE Copper Finishes Lower (2017-8-3) - Shanghai Metals Market (SMM)