Zinc Inventories Return to Declines in China Major Markets, SMM Reports

Published: Jul 24, 2017 13:47 (GMT+8)
Combined zinc inventories in Shanghai, Tianjin and Guangdong decreased 2,700 tonnes to 122,400 tonnes last week, SMM data showed.

SHANGHAI, Jul. 24 (SMM) – Combined zinc inventories in Shanghai, Tianjin and Guangdong decreased 2,700 tonnes to 122,400 tonnes last week, SMM data showed.

Inventories in Guangdong and Tianjin decreased further. Zinc inventories in Shanghai grew slightly.

China Zinc Concentrate TCs Left Untouched, SMM Reports

Arriving shipments in Tianjin were limited due to maintenance at Zijin Mining, Chifeng NFC Zinc Industry, Chihong Zn & Ge’s Hulun Buir smelter and Xing’an Copper & Zinc Smelting Company. Guangdong’s inventories fell slightly because dip-buyers entered the market after zinc prices fell in the latter half of the week. Besides, arriving shipments of imported goods have been limited recently, and stocks have been also consumed. Shanghai witnessed some inflows of imported zinc last week, adding to local inventories.

Zinc Prices to Continue to Fluctuate at High Levels This Week, SMM Foresees

Total inventories in the three regions will remain steady this week due to maintenance at smelters in north China, SMM predicts.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
15 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
15 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
19 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
19 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
19 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
19 hours ago