ILZSG: World Zinc Deficit Intensifies Remarkably despite Big Growth in Output January-May

Published: Jul 18, 2017 10:15 (GMT+8)
International Lead & Zinc Study Group (ILZSG) reported global zinc supply deficit expanded to 178,000 tonnes during January-May, compared to 133,000 tonnes deficit in the same period of 2016, accordin

SHANGHAI, Jul. 18 (SMM) - International Lead & Zinc Study Group (ILZSG) reported global zinc supply deficit expanded to 178,000 tonnes during January-May, compared to 133,000 tonnes deficit in the same period of 2016, according to wenhua.com.

Global zinc ore production increased 6.3% on a yearly basis to 5,375,000 tonnes during January-May.

Zinc Prices to Stay at High Levels This Week, SMM Foresees

Global zinc supply deficit narrowed to 40,300 tonnes in May. Supply deficit was revised to 108,200 tonnes in April.

Zinc Inventories Post Further Growth in China Major Markets, SMM Reports

ILZSG said zinc inventories at consumers, producers and bourses fell from 1,260,400 tonnes to 1,208,300 tonnes in May.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
1 hour ago
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Read More
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Semtech said in its Aug. 25 earnings presentation that its data-center photonics portfolio spans gain chips, high-power CW lasers, SOAs and high-speed photodiodes, while it has secured FY2027 equipment deliveries and acquired additional cleanroom space. Semtech acquired HieFo in March, adding US-based InP gain-chip and DFB-laser manufacturing. Q2 FY2027 data-center sales reached $100 million, up 39% QoQ and 91% YoY; Q3 sales are targeted to rise 45% QoQ and 160% YoY. SMM believes the buildout supports medium-term demand for InP and high-purity indium, although no nameplate capacity or indium consumption was disclosed.
1 hour ago
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
1 hour ago
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
Read More
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
Renforth reported on October 5 that hole SUR-26-60 at its Victoria polymetallic project in Québec intersected 10.9 metres grading 0.544% zinc, 0.079% copper and 0.51 g/t silver from a downhole depth of 17.1 metres. The three-hole, 1,011-metre programme was completed in July to test down-dip continuity beneath the existing resource pit shell.
1 hour ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
1 hour ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Read More
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Bunker Hill said on October 5 that its Idaho zinc-lead-silver mine remained on track to achieve commercial production by year-end 2026. The revised criteria require throughput of at least 65% of the plant’s 1,800-tonne-per-day nameplate capacity, alongside zinc, lead and silver recoveries of at least 70%, for 60 consecutive days. A 10-hole, 975-metre surface drilling programme has also started at Page.
1 hour ago