Why Zinc Prices Shoot up to 3-Month High? Where Are They Going? SMM Reports

Published: Jun 29, 2017 17:54 (GMT+8)
Zinc prices have been rising over the past three weeks. LME zinc rose to $2,700 per tonne and reached $2,769.5 per tonne. August zinc on the SHFE touched as high as 22,790 yuan per tonne.

SHANGHAI, Jun. 29 (SMM) - Zinc prices have been rising over the past three weeks. LME zinc rose to $2,700 per tonne and reached $2,769.5 per tonne. August zinc on the SHFE touched as high as 22,790 yuan per tonne.

What have driven up zinc prices?

China’s Zinc Prices Rise on Robust Consumption

Despite continuous inflows of imported zinc recently, inbound shipments decreased due to the closing of import profit window, SMM said. Output at zinc smelters grew in June, but some have yet to complete maintenance. So, supply increased only slowly. On the demand side, zinc oxide and die-cast zinc alloy consumption is steady in June. And operating rates at galvanizers will rise about 10% in June after environmental protection push in North China, according to SMM survey. Supplies will remain tight in the near term, and give support to zinc prices.

Surge in LME Canceled Warrants Bolster Zinc Price

Increased canceled warrants on the LME have pushed up zinc prices, SMM said. The proportion of canceled warrants on the LME surged to 76.11%, with 224,075 tonnes on June 29.

Spot Zinc Premiums Invert to Discounts as SHFE Zinc Rides Roller Coaster, SMM Reports

Meanwhile, global zinc supply remained in deficit during the first four months of the year. Global refined zinc output was 4.244 million tonnes in this period, while demand was 4.579 million tonnes, according to ILZ and SMM. As of June 29, LME zinc inventories fell over 120,000 tonnes to 294,000 tonnes from the beginning of the year, SMM reported. Falling visible and invisible zinc inventories have given a boost to LME zinc prices.

Positive Macroeconomic Factors Push up Zinc

The US dollar index slumped to 95.65 this week, the lowest from October 2016. US postponed health care votes. When combined with other central banks’ hawkish tone and sluggish economic indicators in the US, the US dollar index slumped. Eurozone and Chinese economy is steady. Positive macroeconomic front inspired commodities. Ferrous and base metals rose across the board.

Japan Zinc Shipments Fall Remarkably January-May

LME zinc prices will hold strong and point toward $2,800 per tonne in the near term, SMM predicts. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)