SHANGHAI, Jun. 21 (SMM) - Tangshan Tenglong Recycling Technologies Co. will build a refined zinc smelting project with designed capacity of 150,000-tpy, cnmn.com reported.
The project will be global largest zinc smelting project using extraction methods, and use ash from steel mills and water-contained gas lime as raw material. The company has signed design contract with ENFI recently.
What Pushes down Zinc Premiums So Hard in Guangdong? Where will They Head? SMM Reports
Zinc Spot Prices Firm in Shanghai as Supplies Decrease, SMM Reports
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
![Secondary Zinc Oxide Payables Remained Relatively Firm, How Will They Perform in March [SMM Analysis]](https://imgqn.smm.cn/usercenter/ipTIN20251217171755.jpg)
![Oversupply in China Drives SHFE Zinc Lower [SMM Daily Zinc Commentary]](https://imgqn.smm.cn/usercenter/VPThK20251217171754.jpg)
![Macro Disturbances Coupled With Rising Inventory in China Weighed on Prices, and the Centers of Both SHFE and LME Moved Lower This Week [SMM Market Review - Weekly Price Review]](https://imgqn.smm.cn/usercenter/TeRBO20251217171754.jpg)
