What Pushes down Zinc Premiums So Hard in Guangdong? Where will They Head? SMM Reports

Published: Jun 21, 2017 10:33 (GMT+8)
Spot premiums on #0 zinc in Guangdong shrank 60-70 yuan per tonne from June 19 to 22,550-22,620 yuan per tonne on June 20, and narrowed 90-110 yuan per tonne from last Friday, SMM data showed.

SHANGHAI, Jun. 21 (SMM) - Spot premiums on #0 zinc in Guangdong shrank 60-70 yuan per tonne from June 19 to 670-730 yuan per tonne on June 20, and narrowed 90-110 yuan per tonne from last Friday, SMM data showed. #0 zinc traded between 22,550-22,620 yuan per tonne June 20.

What have pushed down Guangdong’s spot premiums?

SHFE zinc posted a 5-day winning streak. High zinc prices incentivized zinc smelters to sell actively. The goods releases after delivery under warrants and influx of imported zinc also added to supplies, SMM explained.

Meanwhile, traders also liquidated inventories at the month-end because of settlement and cash tightness, growing goods available.

LME Zinc Inventories Fall to 9-Year Low, LME Zinc Surges to 2-Wk High on Anticipation of Pickup in Steel Plants Demand

But downstream buying interest was weak against high prices. Operating rates at die-cast zinc alloy producers averaged 59.5% in May, down 2% from April, SMM survey showed. The average rate is expected to fall further to 59.17% in June. Sluggish demand dented zinc consumption.

Zinc spot premiums in Guangdong may narrow further next week, SMM predicts. Supplies from traders will increase at the month’s end, while consumption will remain soft. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
9 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
9 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
13 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
13 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
13 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
13 hours ago