Milpo to Release New Resource Assessment for Shalipayco Zinc Mine in Early 2018

Published: Jun 09, 2017 13:14 (GMT+8)
The budget for Shalipayco project’s drilling and other geological engineering work is $ 5 million. Milpo expects to release new resource forecast in early 2018, cnmn.com reported.

SHANGHAI, Jun. 9 (SMM) - The budget for Shalipayco project’s drilling and other geological engineering work is $ 5 million. Milpo expects to release new resource forecast in early 2018, cnmn.com reported.

China Refined Zinc Output Posts Remarkable Decline in May, SMM Reports

Shalipayco is a zinc mine project. Preliminary research has been done during 2008-2014, and drilling length reached 91,000 meters. Milpo estimated zinc reserves with grade above 5% were about 20 million tonnes.

The Shalipayco project is located 170 kilometers in the northeast of Lima. The mine is also associated with lead and silver resources. It covers 21,000 hectares.

SMM Analysis: Is SHFE Zinc Facing Rising Short Squeeze Risk before Delivery?

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Will Indium Phosphide Enter Today’s US-China Summit Agenda?】
29 mins ago
【Flash | Will Indium Phosphide Enter Today’s US-China Summit Agenda?】
Read More
【Flash | Will Indium Phosphide Enter Today’s US-China Summit Agenda?】
【Flash | Will Indium Phosphide Enter Today’s US-China Summit Agenda?】
Could indium phosphide become a minor-metal issue with major implications at today’s U.S.-China summit? China introduced export controls and licensing requirements for indium-related items in February 2025, while expanding AI datacenter optical connectivity continues to lift demand for Indium Phosphide (InP) wafers, epiwafers and lasers. Following the leaders’ May summit, the White House listed indium among the critical-mineral shortages China would address, without announcing removal of existing controls. Whether today’s meeting will produce further clarity on InP export licensing remains uncertain. SMM believes an improved licensing process could ease overseas supply uncertainty; without progress, tension between rising AI optical demand and constrained material flows may persist.
29 mins ago
Silver Bow Mining Proposes US$88 Million Funding and Credit Support Package with Ocean Partners
49 mins ago
Silver Bow Mining Proposes US$88 Million Funding and Credit Support Package with Ocean Partners
Read More
Silver Bow Mining Proposes US$88 Million Funding and Credit Support Package with Ocean Partners
Silver Bow Mining Proposes US$88 Million Funding and Credit Support Package with Ocean Partners
Silver Bow Mining announced a non-binding term sheet with Ocean Partners UK for approximately US$88 million in funding and credit support to advance the restart of Rainbow Block, refurbishment of the Jefferson County Metallurgical Complex and working capital requirements in Montana, US. The proposed package comprises a US$40 million concentrate prepayment facility, up to approximately US$43.1 million in reclamation bond guarantees and a US$5 million lead commitment in a future equity financing. Approved replacement bonds are expected to release approximately US$42 million in cash collateral. The associated ten-year offtake would cover all future lead and zinc concentrates from Rainbow Block and ores outside Montana Tunnels’ M-Pit, plus one-third of those from M-Pit ores, with no minimum tonnage or take-or-pay obligations.
49 mins ago
Macro sentiment is weak, zinc prices encounter resistance [SMM Zinc Morning Comment]
2 hours ago
Macro sentiment is weak, zinc prices encounter resistance [SMM Zinc Morning Comment]
Read More
Macro sentiment is weak, zinc prices encounter resistance [SMM Zinc Morning Comment]
Macro sentiment is weak, zinc prices encounter resistance [SMM Zinc Morning Comment]
[SMM Zinc Morning Comment] Overnight, SHFE zinc recorded a bullish candlestick with a long upper shadow, with support from the middle Bollinger Band below, and the KDJ gap widening upward. On the fundamentals side, the ore shortage has yet to improve, TCs remain low, and bottom support is relatively strong. However, expectations for US Fed interest rate hikes have increased, compounded by...
2 hours ago