Guizhou to Build 5,000-tpy High-Performance Zinc Alloy Project

Published: Jun 8, 2017 11:45
A 5,000-tpy high-performance zinc alloy production line will be built in Guizhou Province, local paper reported.

SHANGHAI, Jun. 8 (SMM) - A 5,000-tpy high-performance zinc alloy production line will be built in Guizhou Province, local paper reported.

Maintenance at China Zinc Smelters to Hurt Zinc Output in June, SMM Reports

Guizhou Metallurgical Chemical Industry Research Institute and Guizhou Hongda Environmental Protection Technology Co. established Industry-University-Research strategic cooperation June 6. The parties will joint construct a 5,000-tpy high-performance zinc alloy production line, which will help save energy consumption by about 30% per tonne compared to existing production lines.

Influx of Imported Zinc to Weigh on Chinese Zinc Prices, SMM Reports

The production line will realize nearly 100 million yuan of production value per annum. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

 

 

 

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Fire Breaks Out at Sulphuric Acid Facility of YP’s Seokpo Smelter; Main Zinc Production Lines Unaffected
57 mins ago
Fire Breaks Out at Sulphuric Acid Facility of YP’s Seokpo Smelter; Main Zinc Production Lines Unaffected
Read More
Fire Breaks Out at Sulphuric Acid Facility of YP’s Seokpo Smelter; Main Zinc Production Lines Unaffected
Fire Breaks Out at Sulphuric Acid Facility of YP’s Seokpo Smelter; Main Zinc Production Lines Unaffected
On July 9, a fire broke out at an air pollution control facility in the sulphuric acid production area of the No. 1 plant at Young Poong’s Seokpo Smelter in South Korea. According to the company’s preliminary statement, the affected facility is located at the tail end of the roaster off-gas treatment system and is not part of the smelter’s core zinc production equipment. No casualties or leaks of hazardous substances have been reported, while production is currently unaffected. The cause of the fire and the extent of the equipment damage remain subject to a joint investigation by the relevant authorities. Attention should be paid to whether repairs to the facility could subsequently constrain roasting operations. Given that the smelter is already undergoing routine maintenance, the overall impact of the incident on refined zinc output is expected to be relatively limited.
57 mins ago
Canadian Government Funds Miner to Recover Germanium from Zinc Ore
1 hour ago
Canadian Government Funds Miner to Recover Germanium from Zinc Ore
Read More
Canadian Government Funds Miner to Recover Germanium from Zinc Ore
Canadian Government Funds Miner to Recover Germanium from Zinc Ore
1 hour ago
2026 Smelting Losses under Pressure, H2 Production and Price Trend Analysis [SMM Analysis]
2 hours ago
2026 Smelting Losses under Pressure, H2 Production and Price Trend Analysis [SMM Analysis]
Read More
2026 Smelting Losses under Pressure, H2 Production and Price Trend Analysis [SMM Analysis]
2026 Smelting Losses under Pressure, H2 Production and Price Trend Analysis [SMM Analysis]
In H1 2026, the refined zinc industry struggled under multiple pressures. Ore supply remained tight, with both domestic and imported zinc concentrate TCs falling to record lows since data records began in 2013, directly squeezing smelter profits, and some enterprises have already fallen into losses. How will the refined zinc market develop in H2?
2 hours ago
Guizhou to Build 5,000-tpy High-Performance Zinc Alloy Project - Shanghai Metals Market (SMM)