SMM 2017 Lead & Zinc Summit: Lead Price to Up to 17,500 Yuan in Second Half of 2017

Published: May 22, 2017 18:15 (GMT+8)
Lead price will advance to 17,500 yuan per tonne and LME lead should trade at $2,100-2,350 per tonne.

SHANGHAI, May 22 (SMM) – Lead price will advance to 17,500 yuan per tonne in peak season, and will register the lowest level at 15,000 yuan per tonne, with mainstream fluctuating at around 16,000 yuan per tonne, SMM expects. LME lead should trade at $2,100-2,350 per tonne.

Collections of Stories in Base Metal Market at SMM 2017 Lead&Zinc Summit

Primary lead output will edg up 1.9% to 3.2 million tonnes in 2017 and secondary lead output will expand 12% to 3.32 million tonnes, compared to 2016’s level. Global lead supply will reverse to surplus of 45,000 tonnes in 2017 from deficit.

Trade price for spot lead surged to 21,825 yuan per tonne in 2016, but the price will be hard to record such high level again in 2017. But, downstream consumption will improve in the rest of year. Uncertainties, such as capitals and market sentiment, will also affect lead price.  

For news cooperation, please contact us by email: sallyzhang@smm.cn orservice.en@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
12 mins ago
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
Read More
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
AXT and Lumentum signed a binding capacity reservation agreement for Indium Phosphide (InP) wafer substrates through December 31, 2031. AXT will reserve minimum annual product capacity and support additional capacity, while Lumentum will provide two $43.5 million deposits, totaling $87 million, to be applied as shipment credits. Lumentum is liable for annual purchase shortfalls, subject to specified exceptions, while AXT’s failure to deliver minimum capacity constitutes a material breach. SMM views the six-year commitment as a firm demand signal for InP substrates and high-purity indium. Wafer volumes, diameter mix and corresponding indium consumption were not disclosed.
12 mins ago
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
3 hours ago
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Read More
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Semtech said in its Aug. 25 earnings presentation that its data-center photonics portfolio spans gain chips, high-power CW lasers, SOAs and high-speed photodiodes, while it has secured FY2027 equipment deliveries and acquired additional cleanroom space. Semtech acquired HieFo in March, adding US-based InP gain-chip and DFB-laser manufacturing. Q2 FY2027 data-center sales reached $100 million, up 39% QoQ and 91% YoY; Q3 sales are targeted to rise 45% QoQ and 160% YoY. SMM believes the buildout supports medium-term demand for InP and high-purity indium, although no nameplate capacity or indium consumption was disclosed.
3 hours ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
3 hours ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Read More
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Bunker Hill said on October 5 that its Idaho zinc-lead-silver mine remained on track to achieve commercial production by year-end 2026. The revised criteria require throughput of at least 65% of the plant’s 1,800-tonne-per-day nameplate capacity, alongside zinc, lead and silver recoveries of at least 70%, for 60 consecutive days. A 10-hole, 975-metre surface drilling programme has also started at Page.
3 hours ago