China Copper Output Growth to Slow Down in 2017, SMM Predicts, with Weaker Consumption

Published: May 10, 2017 09:35 (GMT+8)
China’s refined copper cathode output is expected to slow further in 2017, Shanghai Metals Market predicted at SMM Intelligence Metals Seminar on May 9.

SHANGHAI, May 10 (SMM) – China’s refined copper cathode output is expected to slow further in 2017, Shanghai Metals Market predicted at SMM Intelligence Metals Seminar on May 9. 

The Seminar was jointly held by SMM and Bloomberg during LME Asia Week in Hong Kong. 

New capacities coming online decreased in 2016, and new capacities in 2017 will be mainly commissioned in the second half of the year, explaining the reason behind such a prediction.

China's copper smelting and refining capacity will increase to 7.70 million tonnes and 11.40 million tonnes, respectively, in 2017, SMM estimates.

At the Seminar, SMM also told the attendees that copper consumption during the traditional peak demand season has missed market expectation so far this year. 

“Our recent survey finds orders from copper tube/pipe, plate/sheet, strip and foil are good, but demand from copper rod sector is dragged down by weak consumption in electric wire&cable industry and severe competition,” SMM analyst said. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Does Importing Bare Bright Copper Pay? SMM Launches a New Import Profit/Loss Dashboard
3 hours ago
[SMM Analysis] Does Importing Bare Bright Copper Pay? SMM Launches a New Import Profit/Loss Dashboard
Read More
[SMM Analysis] Does Importing Bare Bright Copper Pay? SMM Launches a New Import Profit/Loss Dashboard
[SMM Analysis] Does Importing Bare Bright Copper Pay? SMM Launches a New Import Profit/Loss Dashboard
[SMM Analysis: Does Importing Bare Bright Copper Pay? SMM Launches a New Import Profit/Loss Dashboard] Imported secondary copper feedstock has long been an important supplement to China’s copper supply, providing smelters and processors with an additional source of raw materials. As copper concentrate supply comes under pressure, this channel has become even more important. To make that easier to track, SMM Market Watch has added a Bare Bright Copper Import Profit/Loss dashboard.
3 hours ago
【Flash | Victorio Molybdenum Resource Expands Ahead of New Economic Assessment】
3 hours ago
【Flash | Victorio Molybdenum Resource Expands Ahead of New Economic Assessment】
Read More
【Flash | Victorio Molybdenum Resource Expands Ahead of New Economic Assessment】
【Flash | Victorio Molybdenum Resource Expands Ahead of New Economic Assessment】
Spartan Metals Corp. released an updated mineral resource estimate for the Victorio tungsten-molybdenum project in New Mexico. Measured and indicated resources total 84.54 million short tons grading 0.09% molybdenum, containing 147.85 million lb (about 67,064 tonnes) of molybdenum. Inferred resources total 101.84 million short tons grading 0.06%, containing 130.02 million lb (about 58,976 tonnes). At a US$50-per-short-ton gross metal value cutoff, the two categories increased 9.5% and 31.9%, respectively, from the historical 2012 estimate. The update will support a preliminary economic assessment expected in the fourth quarter of 2026. These are in-situ resources, not reserves or recoverable production; the project has no current supply impact.
3 hours ago
【Flash | Strike Begins at Highland Valley Copper as Operations Fall to Reduced Capacity】
4 hours ago
【Flash | Strike Begins at Highland Valley Copper as Operations Fall to Reduced Capacity】
Read More
【Flash | Strike Begins at Highland Valley Copper as Operations Fall to Reduced Capacity】
【Flash | Strike Begins at Highland Valley Copper as Operations Fall to Reduced Capacity】
Teck Resources confirmed that United Steelworkers Local 7619 has begun strike action at the Highland Valley Copper operation in Canada, with the mine continuing to operate at reduced capacity. The operation’s existing 2026 molybdenum production guidance is 1,500–1,800 tonnes, against approximately 700 tonnes produced in the first half. Teck said the impact on overall production will depend on the duration of the labour action. The company has not disclosed the scale of the operating reduction, quantified any molybdenum production loss or revised its annual guidance. Attention has therefore shifted from whether the strike would begin to how long reduced operations may continue.
4 hours ago