Taseko Gibraltar Mine Posts Rising Copper Output in Q1 2017

Published: May 09, 2017 14:55 (GMT+8)
copper and molybdenum output at Gibraltar mine increased continuously with improving copper ore grade.

SHANGHAI, May 9 (SMM) – According to Canada Taseko Mines’s report in Q1 2017, copper and molybdenum output at Gibraltar mine increased continuously with improving copper ore grade, reported by Webstock.

Copper output at Gibraltar mine ascent stably over the past year, and the mine produced 41.30 million pound of copper mine in Q1 2017, higher than Q4 2016’s level at 40 million pound and Q1 2016’s level at 28.80 million pound.

Besides, Gibraltar mine produced 900,000 pound of molybdenum in Q1 2017.

The company’s CEO Russell Hallbauer indicated on teleconference of Q1’s revenue that Taseko will put Florence copper mine into operation and has debugged facilities.

“Rising copper prices bring profits at Gibraltar mine”, Hallbauer said, “the company invests constantly into various projects, as copper price increased from $2.2 per pound nine months earlier.”

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
6 hours ago
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
Read More
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
AusQuest (ASX:AQD) has released results of a Controlled Source Audio-frequency Magnetotelluric (CSAMT) survey at its 100%-owned Cangallo porphyry copper-gold project in southern Peru, carried out by Quantec Geoscience. The survey outlines an interpreted mineralised porphyry footprint of at least 2.5 km by 1 km and identifies two additional high-priority targets east and west of the known system whose resistivity signatures resemble the main Cangallo porphyry. Deeper low-resistivity anomalies (250-400 ohm-metres) beyond 500 m at the northern and southern margins point to untested porphyry centres now ranked as priority drill targets. Cangallo spans about 60 km2 near the coast; prior RC drilling confirmed mineralisation over 1,500 m of strike, 250-500 m wide and beyond 400 m depth, with broad intervals around 0.5% copper. Follow-up drilling begins once Stage 4 permits are secured.
6 hours ago
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
6 hours ago
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
Read More
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
Peru's Ministry of Energy and Mines (MINEM) reported national copper output of 1,599,115 tonnes in the first seven months of 2026, up 2.2% year on year, with July production of 236,515 tonnes rising 3.7% on higher output at Antamina (+83%) and Cerro Verde (+18%). On a mine basis, Antamina produced 297,145 tonnes through July, a 54% jump and a 14.3% national share, held by BHP, Glencore, Teck and Mitsubishi. MMG's Las Bambas yielded 245,610 tonnes (-1.1%; 14.83% share), ranking as the No. 2 copper mine, while Freeport's Cerro Verde produced 231,023 tonnes and Southern Copper's Peruvian unit 218,213 tonnes (-10.3%). Antamina and Las Bambas lead on a mine-level basis, underscoring a steady recovery in Peruvian supply that buffers a globally tight concentrate market.
6 hours ago
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
6 hours ago
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
Read More
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
Aldebaran Resources (TSX-V:ALDE) has closed out the 2025-2026 infill and geotechnical campaign at its Altar copper-gold project in San Juan, Argentina, with hole ALD-26-260 returning 1,728.9 m (close to 2 km) of continuous mineralisation grading 0.45% CuEq from 141 m, including 756 m at 0.68% CuEq at depth. CEO John Black said the more-than-1.7-km interval in a single hole underscores the enormous scale of the Altar system. Since the late-2024 resource estimate, over 40,000 m have been drilled at the main deposit, with about 30,000 m at the adjacent Pórfido Radio target still outside any resource. The infill work is designed to upgrade Inferred resources to Measured and Indicated categories and to feed a 2026 resource update and the 2027 pre-feasibility study. Altar comprises several copper-gold porphyry deposits; Aldebaran holds an 80% interest.
6 hours ago