Outlook for Copper Smelting Capacity and Effects from China’s Supply-Side Reform, SMM Reports

Published: Mar 28, 2017 11:32
Expansion of copper smelting capacity will slow, said Zhang Zhizhao, Senior Analyst from Tongling Nonferrous Metals Group Holding Co. Shanghai Branch at the SMM 2017 Copper & Aluminum Summit.

SHANGHAI, Mar. 28 (SMM) - Expansion of copper smelting capacity will slow, said Zhang Zhizhao, Senior Analyst from Tongling Nonferrous Metals Group Holding Co. Shanghai Branch at the SMM 2017 Copper & Aluminum Summit.

Overseas Copper Smelting Projects Decrease

In recent years, copper refining projects overseas were mostly in 2016. Refining capacity expected to come online was 450,000 tonnes, but actually the capacity put into production was even lower. Growth of new smelting capacity slowed significantly to less than 60,000 tonnes in 2017. And there will be only 4 new projects in 2018, with small capacity, said Zhang.

New projects are mainly smelting & refining projects. In a long-term point of view, Chile’s copper refining capacity will be large, and 200,000 tonnes of capacities will be added in 2024. But, this project is of great uncertainty since the country’s copper industry aims to axe capital spending, he added.

Collections of Stories in Base Metal Market at SMM 2017 Copper&Aluminum Summit

Peak Period of Expansion Ends in China

Expansion in China’s copper smelting capacity began in 2009. New capacities peaked around 2013 after commissioning of new capacities added in 2010. Newly increased copper smelting and refining capacities averaged 600,000 tpy and 1.10 million tpy during 2011-2013, and slowed from 2014.

New capacities will be 300,000 tonnes in 2017, Zhang reckons. New capacities will hold stable this year, and lower than 2018. New capacities will hit a high in 2019 with commissioning of projects by Chalco and Qiqihar City, Heilongjiang Province.

China’s Supply-Side Reform Shows Result

Commodity prices witnessed amazing growth in 2016. Demand improved due to the property market and infrastructure construction. Besides, supply-side in China is also a boost. Capacity elimination, destocking and deleverage at upstream industries pushed up commodities and helped improve profit at enterprises last week. At the same time, well-behaved property, infrastructure construction, home appliance and automobile industries turned national economic conditions around. Value-added at industrials, PPI and GDP all topped expectations last year.

Effects from Supply-Side Reform on Copper Smelting

Of the nonferrous metals industry, aluminum bears the brunt of China’s supply-side reform. Lead output was also significantly affected on the environmental protection respect. But copper smelting was limitedly affected by supply-side reform because of advanced smelting and recycling technique. Meanwhile, China’s copper imports were high due to scarce copper resources at home.

On output cut front, Chinese smelters had slashed production against the sluggish commodity market in 2015. But new capacities kept coming online. In this scenario, the National Development & Reform Commission (NDRC) constrains copper capacity expansion in the 13th Five-Year Plan. So, China’s copper smelting capacity will unlikely expand remarkably after 2019. The copper industry will peak around 2020 or new few years, Zhang expects.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
9 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
9 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10
Outlook for Copper Smelting Capacity and Effects from China’s Supply-Side Reform, SMM Reports - Shanghai Metals Market (SMM)