SHFE Market Movement (2017-03-22)

Published: Mar 22, 2017 15:06 (GMT+8)
The following table is base metals movement on the SHFE market on Mar.22 2017.
SHANGHAI,Mar.22 (SMM) - The following table is base metals movement on the SHFE market on Mar.22 2017.
                      
Contract Open High Low Close Settle Ch1 Ch2 Volume Position Change
Al1704 13735 13800 13620 13780 13700 60 -20 35328 137470 -3158
Al1705 13830 13900 13700 13880 13805 70 -5 287178 308716 2154
Al1706 13890 13970 13785 13955 13880 70 -5 76442 128396 4034
Al1707 13955 14030 13850 14030 13955 95 20 16442 46104 3732
Cu1704 47730 48130 46830 47100 47330 -710 -480 68442 118670 -6080
Cu1705 47980 48400 47030 47290 47660 -770 -400 347368 220782 1558
Cu1706 48130 48550 47200 47440 47760 -780 -460 60682 78910 -1370
Cu1707 48290 48690 47360 47600 47790 -720 -530 6666 22920 1398
Zn1704 23790 23830 23370 23450 23555 -225 -120 35218 69794 -4904
Zn1705 23790 23840 23370 23445 23590 -245 -100 607836 271178 -1692
Zn1706 23830 23830 23360 23445 23555 -245 -135 91528 102092 7168
Zn1707 23795 23800 23345 23420 23525 -260 -155 8072 19052 2346
Pb1705 18560 18605 18200 18445 18430 -105 -120 40570 38988 1376
Pb1706 18560 18680 18320 18535 18470 -75 -140 40570 9488 522
Ni1705 84450 85180 83650 84300 84440 -630 -490 353398 444418 -4446
Ni1706 84370 85300 84300 84520 84850 -710 -380 30 188 -6
Sn1705 147150 147530 145570 146580 146640 -570 -510 14932 13148 266
Note:
1. Unit for offers: RMB/mt
2. Unit for trade: 5 mt/lot
3. Unit for trading volumes, positions, and changes in positions is lot.
4. Ch1 = Close - Previous Settle; ch2 = Settle - Previous Settle

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
18 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
18 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
19 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
19 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
19 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
19 hours ago