Presidential Announcement on Steel Pipe-DOC’s Request for Comments

Published: Mar 22, 2017 14:12 (GMT+8)
At the end of January, the White House released the attached memorandum which calls for the development of a plan to require American-made pipe and equipment in pipeline projects in the US。

March 22, 2017 01:30:48 AM

Falls Church, VA(AIIS) - At the end of January, the White House released the attached memorandum which calls for the development of a plan to require American-made pipe and equipment in pipeline projects in the United States.

The memorandum directed the U.S. Department of Commerce (DOC) to develop a plan to implement the memorandum’s objectives, and the DOC has published a request for public comments on the following subjects in connection with the White House memorandum:

(a)  What is your role regarding U.S. pipelines?  Operation; Construction; Pipeline manufacturing; Steel manufacturing; Wholesale distribution; Other (if, “Other”, please describe).

(b)  Your North American Industry Classification System (NAICS) code(s)?

(c)  What types of pipelines does your company operate, construct, manufacture, or distribute?

(d)  Where are your operations located?

(e)  How many employees?

(f)  Approximate sales revenue?  (Presumably on an annual basis.)

(g)  Approximately how many miles of pipeline did your company construct, repair, fabricate, or distribute in 2016?

(h)  In a few sentences, describe your assessment of U.S. pipeline demand (such as miles of pipeline planned for construction) for the next few years.

(i)  To what extent are your companies’ pipeline materials sourced domestically?  What factors influence this decision (price, quality, supply shortages, pipeline requirements, domestic sourcing requirements, etc.)?

(j)  If applicable, please estimate your company’s capacity to fabricate pipelines or steel for pipelines.  What was your capacity utilization in 2016?  If applicable, what factors prevented your company from operating at capacity?

(k)  If applicable, please estimate in days or months supply your existing inventories of pipe.  What share of your inventory is fully produced in the United States?

(l)  To what extent are materials other than iron and steel the primary materials used in your pipelines?

(m)  To what extent is technology changing the material requirements and construction techniques in the pipeline industry?

(n)  If applicable, how many permits from a Federal agency are required for pipeline construction or repair?  Which Federal agencies require permits and how long does it take to obtain them?

(o)  Please describe in a few sentences how domestic content requirements would affect your operations.

For purposes of this notice, the term “pipeline” refers to any conduit of pipe used for conveyance of gases, liquids or other products.  The physical facilities include: Pipes, valves, fittings, connectors, and other iron and steel assemblies or apparatus attached

to the pipe.  Also for purposes of this notice, the term “materials and equipment” refers to the iron, steel and all precursors, alloys or substitutes used in the fabrication of pipelines as well as pipeline coatings, and the term “equipment” refers to valves and other steel and/or iron apparatus attached to pipe.

Comments must be submitted to the DOC by April 7, 2017.

Courtesy : AIIS

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Sep 28, 2026 17:34 (GMT+8)
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Read More
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
[Waste Lead-Acid Battery Market Update] Recently, the Heyuan Municipal Ecology and Environment Bureau issued the "Notice on Regulating the Management of Waste Lead-Acid Batteries." According to the Ecological Environment Code of the People's Republic of China, enterprises and public institutions that engage in the collection and storage of waste without a permit may be fined 200,000-1 million yuan; those that engage in utilization and disposal operations without a permit may be fined 1-5 million yuan and ordered to suspend operations or shut down, with responsible persons fined 100,000-1 million yuan; if the act constitutes a crime, criminal liability shall be pursued in accordance with the law.
Sep 28, 2026 17:34 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Sep 28, 2026 17:33 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Read More
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
[Market Dynamics of Waste Lead-Acid Batteries from E-bikes] Recently, the Guangzhou Municipal Ecology and Environment Bureau issued a notice on the key points for environmental management of waste lead-acid batteries from e-bikes in Guangzhou. The document clarifies that waste lead-acid batteries are hazardous waste (HW31, 900-52), and scrap batteries generated from store recycling, trade-in, and repair must be transferred to licensed units. Units holding a hazardous waste collection permit (including 900-52) are exempt from electronic transfer manifests during the collection process under the centralized collection pilot program.
Sep 28, 2026 17:33 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Sep 26, 2026 01:38 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Read More
Peru sees 1 million t/y copper output boost within five to six years
Peru sees 1 million t/y copper output boost within five to six years
Peru's Energy and Mines Minister Guillermo Shinno said the country expects to add about 1 million tonnes of annual copper production within five to six years through new mining projects. The world's third-largest copper producer anticipates 2026 output of 2.5 to 2.7 million tonnes, roughly unchanged from 2023 as declining ore grades and recurring social conflicts weigh on supply. The newly elected government is seeking to reverse that stagnation by cutting red tape; in the two months since taking office, mining companies have stepped up engagement with the ministry. Shinno said officials have identified 27 permits that could be eliminated from roughly 100 mining-sector requirements, without lowering environmenta
Sep 26, 2026 01:38 (GMT+8)