Will Zinc Get Boost after Output Cut Deal? SMM Reports

Published: Mar 14, 2017 10:11 (GMT+8)
Zinc prices fell noticeably last week. But zinc concentrate TCs in Central West China and some other regions were still low between 3,600-3,800 yuan per tonne (zinc content) with benchmark price at 15

SHANGHAI, Mar. 14 (SMM) - Zinc prices fell noticeably last week. But zinc concentrate TCs in Central West China and some other regions were still low between 3,600-3,800 yuan per tonne (zinc content) with benchmark price at 15,000 yuan per tonne, SMM understands. Smelters incurred 200 yuan per tonne losses. Smelters thus plan to adjust their output plan.

Zinc Price to Rally This Week, SMM Predicts

Zinc smelters in Central West China agreed to slash output in the near term at a seminar. Shaanxi Dongling Industry & Trade Group prolonged maintenance plan to 1-2 months, compared to previous 15-20 days maintenance plan in mid-to-late March. Hanzhong Zinc Industry Co. and Shangluo Smelter may also undertake maintenance.

Such maintenance at these smelters will support zinc prices in the near term, SMM said.

Key zinc smelters in Central West China which have over 200,000-tpy zinc smelting capacity met in Xi’an March 13 and reached a deal on several respects, SMM learned.

They agreed to adjust production plan more flexibly since TCs of domestic and imported zinc concentrate are blow cost line. The Pb&Zn Branch of China Nonferrous Metal Industry Association agreed to push establishment of negotiation coordination mechanism for imported raw materials which was put forward December 14, 2016, so as to promote transformation and help increase profit for smelters. Participants will adjust structure and push transformation to meet China’s supply-side reform and capacity elimination requirements. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
11 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
11 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
14 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
14 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
15 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
15 hours ago