SHANGHAI, Feb. 20 (SMM) - Tongling (Jinguan) Copper Smelter’s copper cathode output was 37,268 tonnes in January, 9.29% higher than target, local paper reported.
It processed 138,779 tonnes of copper concentrate, 2.21% above target. Sulfuric acid production was 133,693 tonnes, 5.94% above target.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn