Report: China’s Steel Cuts in 2016 Were Fake, Capacity Actually Went Up

Published: Feb 14, 2017 10:44 (GMT+8)
China announced last year it had implemented ambitious cuts in steel capacity. Now, a new report says that not only did those cuts not happen, but China actually increased steel production capacity.

by Jeff Yoders on FEBRUARY 13, 2017

China announced last year it had implemented ambitious cuts in steel capacity. Now, a new report says that not only did those cuts not happen, but China actually increased steel production capacity.

But a new report by Greenpeace East Asia and Chinese consultancy Custeel says that number was largely smog and mirrors. Many of the plants China says it closed down were already idle, while production was restarted elsewhere and brand new plants opened.

China, which accounts for half the world’s steel production, has a total capacity of 1.1 billion metric tons ): It announced plans to eliminate 100-150 mt of annual production over the next five years.

Last year, it said it had far exceeded its initial target to cut capacity by 45 million mt, which China said its steel sector exceeded, recording total 2016 cuts of around 85 mmt.

But the Geenpeace/Custeel report said that 73% of the announced cuts in capacity were already idle — in other words the plants were not operating. Only 23 mmt of cut capacity involved shutting down production plants that were operating.

At the same time, some 54 mmt of capacity were restarted, and 12 mmt of new operating capacity came online.

That left China showing a net increase in operating capacity of 36.5 mmt last year, a figure that is consistent with a 3% increase in steel production in the second half of last year.

Such an increase is consistent with evidence of a deterioration in the air quality in Beijing in the second half of last year — the steel industry is a heavy consumer of coal and contributor to air pollution, and most of the restarted capacity came in the industrial provinces near the capital, Shanxi, Hebei and Tianjin.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
18 hours ago
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Read More
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
[Waste Lead-Acid Battery Market Update] Recently, the Heyuan Municipal Ecology and Environment Bureau issued the "Notice on Regulating the Management of Waste Lead-Acid Batteries." According to the Ecological Environment Code of the People's Republic of China, enterprises and public institutions that engage in the collection and storage of waste without a permit may be fined 200,000-1 million yuan; those that engage in utilization and disposal operations without a permit may be fined 1-5 million yuan and ordered to suspend operations or shut down, with responsible persons fined 100,000-1 million yuan; if the act constitutes a crime, criminal liability shall be pursued in accordance with the law.
18 hours ago
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
18 hours ago
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Read More
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
[Market Dynamics of Waste Lead-Acid Batteries from E-bikes] Recently, the Guangzhou Municipal Ecology and Environment Bureau issued a notice on the key points for environmental management of waste lead-acid batteries from e-bikes in Guangzhou. The document clarifies that waste lead-acid batteries are hazardous waste (HW31, 900-52), and scrap batteries generated from store recycling, trade-in, and repair must be transferred to licensed units. Units holding a hazardous waste collection permit (including 900-52) are exempt from electronic transfer manifests during the collection process under the centralized collection pilot program.
18 hours ago
Peru sees 1 million t/y copper output boost within five to six years
Sep 26, 2026 01:38 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Read More
Peru sees 1 million t/y copper output boost within five to six years
Peru sees 1 million t/y copper output boost within five to six years
Peru's Energy and Mines Minister Guillermo Shinno said the country expects to add about 1 million tonnes of annual copper production within five to six years through new mining projects. The world's third-largest copper producer anticipates 2026 output of 2.5 to 2.7 million tonnes, roughly unchanged from 2023 as declining ore grades and recurring social conflicts weigh on supply. The newly elected government is seeking to reverse that stagnation by cutting red tape; in the two months since taking office, mining companies have stepped up engagement with the ministry. Shinno said officials have identified 27 permits that could be eliminated from roughly 100 mining-sector requirements, without lowering environmenta
Sep 26, 2026 01:38 (GMT+8)