Will BHP Billiton Compromise after Strike at Escondida Mine? What’s Impact on Copper Market? SMM Reports

Published: Feb 13, 2017 11:44 (GMT+8)
Workers at BHP Billiton's Escondida mine in northern Chile walked out on strike from February 9. SMM sees low chance for BHP Billiton to compromise to meet workers’ new requirements.

SHANGHAI, Feb. 13 (SMM) - Workers at BHP Billiton's Escondida mine in northern Chile walked out on strike from February 9. SMM sees low chance for BHP Billiton to compromise to meet workers’ new requirements after considering multiple factors. 

First, BHP Billiton registered a net loss of $6.39 billion during the fiscal year of 2016 (from July 2015 to June 2015), the biggest loss on the record. The company has not released its financial report for 2H 2016, but it is unlikely to see the huge losses to narrow significantly in only half a year. Hence, the company has no adequate cash liquidity to meet workers’ wage requirements. 

Why Chinese Imports of Unwrought Copper and Copper Semis Drop both on Monthly and Yearly Basis in January 2017? SMM Reports

Second, a typical collective bargaining procedure in Chile lasts about 80 days in according to the country’s labor law, including 30 days’ strike. But, there are no limits on negotiating time legally. After the talks, the employer and employee will sign a new labor contract, and the contract usually lasts for 2 or 4 years, a reason behind periodic strike. The employer and union usually starts the talks 45 days ahead of expiration of the old contract, and if the two parties fail to reach an agreement on new terms and clauses, the government will start a 5-day mediation work after being agreed by the two parties. 5 more mediation days will be added if the two parties require. The strike will begin if negotiations mediated by the government fail. The employer is able to employ temporary workers during the strike period, and the employment can be done immediately once wage is not below the original salary plus inflation rate. If not, replacement workers will not be deployed after 15-day strike. This means the employer is able to employ temporary workers or enroll new workers without adding wages after the strike time exceeds the time the employer expects. 

At present, production at Escondida mine has been halted, and the union said workers set up camp at the mine, and hoarded food and water for long standoff. SMM estimates the strike will not last for a long time as the longer strike, the bigger losses workers will face, and the strike will likely not exceed 30 days. 

The strike will affect daily production loss at the mine by around 3,000-4,000 tonnes (Cu content), SMM estimates. According to Wood Mackenzie, global copper ore output was 20.07 million tonnes (Cu content) in 2015, averaging 1.67 million tonnes per month. If the strike lasts for 30 days at Escondida mine, production loss will likely reach 90-100,000 tonnes (Cu content). The small amount, coupled with ample copper inventories, will play a small impact on copper market, and the major influence will be on market sentiment. 

“On the supply&demand front, copper market now has no rising strength, and in China’s market, it is a traditionally off-demand season, and domestic demand will not recover until after Lantern Festival on February 11,” SMM copper analyst says. 
On the SHFE, copper inventories are on the rise for season factor, and spot prices trade at discounts after returning from the holiday, giving no price rising strength, SMM adds. 

Salary negotiation at Escondida mine has been seen the benchmark to the industry, so eyes should be paid to the impact on talks at other large global copper mines which will face salary talks in 2017. Those talks will add production disruption to world’s copper ore mines in 2017, and the global ore output growth may be lower than previous estimation, and the combined impact on market price, on the other hand, will also be higher, SMM concludes. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
21 mins ago
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
Read More
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
Cobre Panamá could again become a major source of global copper supply if Panama and First Quantum agree on a new operating framework. The mine produced 330.9 kt of copper in 2023 and historically supplied around 1% of global output. While stockpile processing has resumed, fresh mining remains suspended. Any restart would likely be phased, with timing dependent on negotiations, legal conditions and operational remobilisation.
21 mins ago
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
5 hours ago
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Read More
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta has unveiled a major investment plan, under which Vedanta Copper intends to invest $2.3 billion in India and Saudi Arabia over the next three to four years, targeting annual copper production of more than 1 million tonnes by 2030. The company aims to produce 500,000 tonnes annually in both India and Saudi Arabia, alongside existing production of 100,000 tonnes in Fujairah, UAE. Around $2 billion will be invested in Saudi copper mining, smelting and rod projects, with an investment decision on the proposed Saudi copper smelter expected this quarter. Vedanta is also seeking to restart its Tuticorin copper smelter in India, which has been closed since 2018. The company expects a court ruling within three months and, subject to approval, plans to invest $250 million in refurbishing the facility, targeting a restart within eight to nine months and annual copper output of 250,000 tonnes. Meanwhile, its Silvassa facility is operating at around 95% capacity, with annualised copper cathode production exceeding 245,000 tonnes.
5 hours ago
London BTC flags copper and antimony at Nevada Black Star
7 hours ago
London BTC flags copper and antimony at Nevada Black Star
Read More
London BTC flags copper and antimony at Nevada Black Star
London BTC flags copper and antimony at Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) announced on 5 October 2026 initial on-site pXRF results from its Black Star gold-critical minerals project in Pershing County, Nevada. A maiden programme collected 69 rock-chip samples along a 2.5km corridor between the Western and Eastern targets. pXRF readings showed antimony up to 0.44% Sb, copper up to 30.0% Cu, bismuth up to 0.73% Bi and silver up to 811 ppm Ag, with the antimony-copper association appearing at both ends of the corridor. The signature mirrors a historical 1985 sample 120m south of the claims (>1% Sb, 2% Cu, 700 ppm Ag). Earlier due-diligence sampling returned up to 16.23 g/t gold and 50.5 g/t silver. Samples are now with MSALABS for laboratory assays, with full multi-element geochemistry including antimony, tungsten and copper to follow. Copper, as a by-product credit, adds strategic appeal under US critical-minerals policy, though results remain preliminary field readings.
7 hours ago
Will BHP Billiton Compromise after Strike at Escondida Mine? What’s Impact on Copper Market? SMM Reports - Shanghai Metals Market (SMM)