Liberty House, Gupta Acquire UK’s Last Aluminum Smelter

Published: Dec 23, 2016 11:40
Indian-born metals tycoon Sanjeev Gupta seems to be snapping up metals fast, whether those investments are aluminum, steel or other producers.

by Sohrab Darabshaw on DECEMBER 22, 2016

Indian-born metals tycoon Sanjeev Gupta seems to be snapping up metals fast, whether those investments are aluminum, steel or other producers. Gupta’s investments come as competition is shying away from investing in the U.K. steel and other metals businesses.

Gupta recently announced that he would be investing $148 million (around £120 million) in Britain’s last standing aluminum smelter. Gupta’s Liberty House along with his father’s SIMEC business will be paying $371 million (£330 million) to buy assets that include the plant at Lochaber in the western Scottish Highlands and two hydroelectric plants that power it.

UK Aluminum

The plan is to upgrade the equipment and turn it into an aluminum wheel manufacturing facility. Gupta’s Liberty and sister company SIMEC are part of the Gupta Family Group Alliance (GFG) , and, according to a report in the London Telegraph, “the move is part of the parent group’s strategy  to build what it describes as ‘a competitive and sustainable metals and engineering sector’ in the U.K.”

The Scottish government has supported the acquisition and has guaranteed the power purchases of the aluminum smelter for the next 25 years.

Liberty supplies parts to the U.K.’s automobile industry with clients including Jaguar Land Rover. Lochaber, with a capacity of 47,000 metric tons, was put on the block by Rio Tinto under its plan to dispose of its non-core assets.

The deal will immediately safeguard the existing 170 jobs, generate another 300 jobs directly and about 2,000 direct and indirect jobs in the overall supply chain.

This deal marks one of the largest single investments made by the GFG Alliance. It also marks a major step in GFG’s plan to forge a sustainable metals and engineering sector in the U.K. by integrating the supply chain.

Other Acquisitions

Liberty has spent at least $618 million (£500 million) in the past year on acquisitions. In November, it had also signaled its intention to buy some of Tata Steel UK’s specialty steel business.

The Telegraph says the purchase of various steel furnaces is part of Gupta’s larger plan to complete his “green steel” vision, where scrap steel is recycled in the U.K. market.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Operating Rate of SMM Scrap-Derived Copper Anode Producers 58.81%
12 hours ago
Operating Rate of SMM Scrap-Derived Copper Anode Producers 58.81%
Read More
Operating Rate of SMM Scrap-Derived Copper Anode Producers 58.81%
Operating Rate of SMM Scrap-Derived Copper Anode Producers 58.81%
[SMM Copper Anode] After the holiday, scrap-derived copper anode producers in China had all resumed normal operations. From March 6 to March 12, the operating rate of SMM scrap-derived copper anode producers was 58.81%, up 10.43 percentage points MoM. As the price difference between primary metal and scrap narrowed and copper anode RCs remained high, the operating rate is expected to fall to 58.72% next week.
12 hours ago
Yukun Materials' Phase II Recycled Copper Ingot Project Nears Completion, Aims for 100,000 Tons Annual Capacity
14 hours ago
Yukun Materials' Phase II Recycled Copper Ingot Project Nears Completion, Aims for 100,000 Tons Annual Capacity
Read More
Yukun Materials' Phase II Recycled Copper Ingot Project Nears Completion, Aims for 100,000 Tons Annual Capacity
Yukun Materials' Phase II Recycled Copper Ingot Project Nears Completion, Aims for 100,000 Tons Annual Capacity
At the Phase II construction site of Yukun Materials Technology Co., Ltd.'s recycled copper ingot project, it can be seen that the main structure of the plant has been completed. The entire project is expected to be fully finished in the second quarter. With a total investment of 1.08 billion yuan for Phase II, the annual production capacity of recycled copper ingots is projected to reach 100,000 tons once it reaches full operation.
14 hours ago
This Week, the Operating Rate of the Enamelled Wire Industry Rebounded to 85.13%
14 hours ago
This Week, the Operating Rate of the Enamelled Wire Industry Rebounded to 85.13%
Read More
This Week, the Operating Rate of the Enamelled Wire Industry Rebounded to 85.13%
This Week, the Operating Rate of the Enamelled Wire Industry Rebounded to 85.13%
Supported by ample earlier orders and full production schedules, the operating rate of the enamelled wire industry rose 4.06 percentage points WoW to 85.13% this week. According to enterprise feedback, new orders underperformed expectations this week. Affected by downstream wait-and-see sentiment amid falling prices, enterprises were relatively cautious in placing orders, and new orders increased by only 0.11 percentage points.
14 hours ago