SHFE Copper Ends with Gains (2016-12-5)

Published: Dec 5, 2016 19:36
SHFE 1702 copper opened at RMB 46,650/mt and finally closed at RMB 47,360/mt, up RMB 710/mt.

SHANGHAI, Dec. 5 (SMM) – On Monday, Shanghai Interbank Offered Rate (Shibor) was 2.3080%, down 1.20 basis points and 7-day Shibor was 2.4970%, down 0.40 basis point. Capital liquidity eased slightly. SHFE 1702 copper opened at RMB 46,650/mt and then declined to RMB 46,270/mt, hurt by positions opening by shorts. Later, the contract broke through the 5 and 10-day moving averages to RMB 47,630/mt with longs strengthening. SHFE 1702 copper dropped at the tail of trading due to longs taking profits and finally closed at RMB 47,360/mt, up RMB 710/mt. Positions increased 21,262 to 252,000 and trading volumes rose 33,918 to 364,000 lots. Positions of all SHFE copper contracts were up 23,248 to 547,682 with trading volumes up 15,482 to 548,000 lots. SHFE 1702 copper rallied on Monday as capital eased.

SHFE 1702 copper is predicted to keep rising for the short term. Attention should be on US’s employment condition in November and ISM nonmanufacturing PMI on Monday’s night.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
11 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Read More
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
The Autonomous Bougainville Government said the Lloyds Panguna Metals & Energy Limited camp at the Panguna copper-gold mine was attacked on September 13. Personnel were assaulted and machinery was damaged in an arson attack. Authorities have not disclosed the extent of injuries or equipment losses. President Ishmael Toroama condemned the incident and said the government would continue pursuing the mine’s redevelopment.
11 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
11 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
Read More
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
According to Iranian media reports citing Seyed Mostafa Feiz, CEO of the National Iranian Copper Industries Company (NICICO), Iran’s geological copper ore resources rose to 24.5 billion tonnes from 22.2 billion tonnes at the start of the Iranian year, up 10.6%. Mineable (designable) reserves increased to 18.2 billion tonnes from 16.8 billion tonnes, while 198,462 metres of exploration drilling were completed in the first five months—about 40% of the 500,000-metre full-year target. At Miduk, mineable reserves rose 123% to 1.77 billion tonnes and geological resources increased 186% to 2.883 billion tonnes. The Sarcheshmeh cluster’s mineable reserves reached 7.7 billion tonnes at an average grade of 0.41%, with the mine’s operating permit extended through Iranian year 1429 (around 2050–51). Total material extracted during the period exceeded 153 million tonnes, up about 4% year on year; this figure includes sulphide ore, oxide material and waste rock, and is not copper production. The expanded resource and reserve base supports Iran’s longer-term development potential, but does not imply an immediate increase in supply.
11 hours ago