DGCX reports a records the highest year-to-date volumes since inception, growing 43% from last year

Published: Sep 2, 2016 10:05
Volumes on the Dubai Gold and Commodities Exchange (DGCX) touched close to 13 million contracts, growing 43% from same period last year.

UNITED ARAB EMIRATES September 01 2016 5:37 PM

DUBAI (Scrap Register): Volumes on the Dubai Gold and Commodities Exchange (DGCX) touched close to 13 million contracts, growing 43% from same period last year to record the highest ever volume for this period in over a decade.

This year, the Exchange recorded an average volume of 75,516 contracts a day, valued at around US$ 1.70 billion.

The Exchange also registered an impressive average Open Interest (OI) position of 156,965 contracts representing a growth of 167% over the same period last year. On 29th August 2016, the Exchange recorded the highest ever OI of 503, 262 contracts valued at over US$ 8 billion. The OI records indicate the increased trust and participation of market participants on DGCX, the region's largest and most diversified derivatives bourse.

Performance of DGCX products 

DGCX's Indian Rupee traded an average of 41,751 contracts in August, valued at over US $ 1.24 billion. The Indian Rupee options contract set the highest ever average OI record with 5,353 contracts, up 38% from last year, and also registered a 115% year-to-date volume growth from 2015.

Average Daily Volumes (ADV) in DGCX's gold product suite touched 2,749 contracts in August, growing 15% from last year, while average OI in August 2016 was up by 153%.

Commenting on DGCX's performance, Gaurang Desai, CEO of DGCX said:  "We are pleased to end the summer on a high note. The last few months saw DGCX set number of volume and open interest records. Yet as we move forward to the rest of the year, our focus remains on development of two key parameters which is (a) introducing more products that are unique, innovative and regionally relevant and (b) expand our membership base to deepen the market outreach."

In August 2016, Exchange also introduced what is known as Full-depth market data feed to equip sophisticated traders to understand the market dynamics more efficiently and execute newer trading strategies. The Full-depth market data flow disseminates all available market orders in an order book on real time basis for better market visibility. The new data flow works in parallel to existing Best-Five market data feed.

DGCX also offers proximity hosting services along with low-latency trading access with its telecom services partners. This premium service cuts down execution time significantly for global traders. Faster services like this encourage more participation from global market participants to access DGCX markets and in turn increase diversity in participant base. 

"We have significantly stepped up efforts on providing world-class connectivity and market accessibility solutions for our global and diversified trading community by constantly investing in our technology infrastructure and technology services. These efforts will go a long way in establishing DGCX and Dubai as a key global trading hub, amongst the likes of Chicago, New York, London, Mumbai and Singapore," concluded Gaurang.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
4 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Read More
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
The Autonomous Bougainville Government said the Lloyds Panguna Metals & Energy Limited camp at the Panguna copper-gold mine was attacked on September 13. Personnel were assaulted and machinery was damaged in an arson attack. Authorities have not disclosed the extent of injuries or equipment losses. President Ishmael Toroama condemned the incident and said the government would continue pursuing the mine’s redevelopment.
4 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
4 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
Read More
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
According to Iranian media reports citing Seyed Mostafa Feiz, CEO of the National Iranian Copper Industries Company (NICICO), Iran’s geological copper ore resources rose to 24.5 billion tonnes from 22.2 billion tonnes at the start of the Iranian year, up 10.6%. Mineable (designable) reserves increased to 18.2 billion tonnes from 16.8 billion tonnes, while 198,462 metres of exploration drilling were completed in the first five months—about 40% of the 500,000-metre full-year target. At Miduk, mineable reserves rose 123% to 1.77 billion tonnes and geological resources increased 186% to 2.883 billion tonnes. The Sarcheshmeh cluster’s mineable reserves reached 7.7 billion tonnes at an average grade of 0.41%, with the mine’s operating permit extended through Iranian year 1429 (around 2050–51). Total material extracted during the period exceeded 153 million tonnes, up about 4% year on year; this figure includes sulphide ore, oxide material and waste rock, and is not copper production. The expanded resource and reserve base supports Iran’s longer-term development potential, but does not imply an immediate increase in supply.
4 hours ago
DGCX reports a records the highest year-to-date volumes since inception, growing 43% from last year - Shanghai Metals Market (SMM)