SHANGHAI, Apr. 7 (SMM) - Jiangxi Copper Co. began design work recently to increase 10,000 tonne per day ore beneficiation capacity at its Chengmenshan copper mine, which will grow the mine’s total daily ore processing capacity to 18,000 tonne, cnmn.com reports.
Once operational, the open-pit mine is expected to produce 31,824 tonnes (copper content) of copper concentrate each year, and about 1.01 million tonnes of standard sulfur concentrate.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn