SHFE Market Movement (2016-03-02)

Published: Mar 02, 2016 15:11 (GMT+8)
The following table is base metals movement on the SHFE market on Match.2 2016.
SHANGHAI,Match.2 (SMM) - The following table is base metals   movement on the SHFE market on Match.2 2016.











ContractOpenHighLowCloseSettleCh1Ch2VolumePositionChange
Al1603111751122511075112151115535-25525053640-1370
Al1604112101128511100112701119560-1591990133064-12726
Al16051126011340111551132511255801018126425172815084
Al160611310113751120011360113057520325741488924558
Cu160335940366503583036650362709305503720065870-11460
Cu16043611036830359703682036310950440349666174522-8194
Cu16053616036960360203694036430105054052908632570249664
Cu1606362103700036060369703651010405808506414040212634
Zn16031409014295140051425014210270230620034430-2540
Zn16041417014360140651431014215240145253744123474-7816
Zn1605142151443014120143701428525016539502617306822484
Zn1606142501447014170144351433527017036762574104636
Pb160413690138001362513740137301059575181994280
Pb160513690136301346513600135651401057518140121454
Ni1605680006904067830689506841017301190783972431708-14690
Ni16066810069180681006918068400172094017859040
Sn16051046301050201038701047101043708505103230014214-144
Note:
    1. Unit for offers: RMB/mt
    2. Unit for trade: 5 mt/lot
    3. Unit for trading volumes, positions, and changes in positions is   lot.
    4. Ch1 = Close - Previous Settle; ch2 = Settle - Previous Settle


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
2 hours ago
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Read More
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta has unveiled a major investment plan, under which Vedanta Copper intends to invest $2.3 billion in India and Saudi Arabia over the next three to four years, targeting annual copper production of more than 1 million tonnes by 2030. The company aims to produce 500,000 tonnes annually in both India and Saudi Arabia, alongside existing production of 100,000 tonnes in Fujairah, UAE. Around $2 billion will be invested in Saudi copper mining, smelting and rod projects, with an investment decision on the proposed Saudi copper smelter expected this quarter. Vedanta is also seeking to restart its Tuticorin copper smelter in India, which has been closed since 2018. The company expects a court ruling within three months and, subject to approval, plans to invest $250 million in refurbishing the facility, targeting a restart within eight to nine months and annual copper output of 250,000 tonnes. Meanwhile, its Silvassa facility is operating at around 95% capacity, with annualised copper cathode production exceeding 245,000 tonnes.
2 hours ago
London BTC flags copper and antimony at Nevada Black Star
5 hours ago
London BTC flags copper and antimony at Nevada Black Star
Read More
London BTC flags copper and antimony at Nevada Black Star
London BTC flags copper and antimony at Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) announced on 5 October 2026 initial on-site pXRF results from its Black Star gold-critical minerals project in Pershing County, Nevada. A maiden programme collected 69 rock-chip samples along a 2.5km corridor between the Western and Eastern targets. pXRF readings showed antimony up to 0.44% Sb, copper up to 30.0% Cu, bismuth up to 0.73% Bi and silver up to 811 ppm Ag, with the antimony-copper association appearing at both ends of the corridor. The signature mirrors a historical 1985 sample 120m south of the claims (>1% Sb, 2% Cu, 700 ppm Ag). Earlier due-diligence sampling returned up to 16.23 g/t gold and 50.5 g/t silver. Samples are now with MSALABS for laboratory assays, with full multi-element geochemistry including antimony, tungsten and copper to follow. Copper, as a by-product credit, adds strategic appeal under US critical-minerals policy, though results remain preliminary field readings.
5 hours ago
Kantra extends Nugent copper-gold lode 70m below resource
5 hours ago
Kantra extends Nugent copper-gold lode 70m below resource
Read More
Kantra extends Nugent copper-gold lode 70m below resource
Kantra extends Nugent copper-gold lode 70m below resource
Kantra Copper Limited (ASX:KAN) reported underground diamond drilling at its Kanmantoo copper mine in South Australia that extends the Nugent lode 70m below the 2025 Mineral Resource Estimate and 370m beneath the current 950 Level stopping horizon. Hole 26KVUG0949 returned 70m at 1.18% copper and 0.24g/t gold from 507m, including 38m at 1.46% copper and 0.18g/t gold. Nugent, on the deposit's south-western edge, carries generally higher gold grades. By end-August 2026 the company had completed 38,535m of underground diamond drilling, including 12,024m at Nugent, and expects a resource update incorporating about 80,000m of drilling in late October. Kanmantoo is an operating mine that produced 3,170t of copper in the June 2026 quarter; 2026 guidance is 12,750-14,000t of copper, and the deep extension offers low-capital growth from existing infrastructure.
5 hours ago