Chinese copper scrap prices slide further

Published: Jan 12, 2016 10:05 (GMT+8)
Chinese copper scrap prices dropped heavily on January 8th, 2016.

By Anil Mathews (ScrapMonster Author)

January 11, 2016 04:31:31 AM

BEIJING (Scrap Monster):  The Chinese copper scrap prices witnessed sharp downfall on ScrapMonster Price Index  as on Friday, January 8th.

#1 Copper Bare Bright prices were down by CNY 250 per MT over the previous day. The price of #1 Copper Wire and Tubing and #2 Copper Wire and Tubing too tumbled by CNY 250 per MT each.

#1 Insulated Copper Wire 85% Recovery was down CNY 100 per MT to CNY 26,500 per MT. The price of #2 Insulated Copper Wire 50% Recovery fell CNY 50 per MT to touch CNY 22,450 per MT.

Copper Transformer scrap prices too declined by CNY 50 per MT over the previous day. The prices of Cu Yokes too declined by CNY 100 per MT.

Cu/Al Radiator scrap prices witnessed decline of CNY 50 per MT.

Harness Wire 35% Recovery and Heater Cores were down by CNY 100 per MT each on Friday, January 8th.

Meantime, Scrap Electric Motors and Sealed Units prices witnessed marginal decline of CNY 50 per MT each over the previous day.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Novametal’s Molybdenum Benchmark Rises, but 316 Surcharge Transmission Remains Limited】
1 min ago
【Flash | Novametal’s Molybdenum Benchmark Rises, but 316 Surcharge Transmission Remains Limited】
Read More
【Flash | Novametal’s Molybdenum Benchmark Rises, but 316 Surcharge Transmission Remains Limited】
【Flash | Novametal’s Molybdenum Benchmark Rises, but 316 Surcharge Transmission Remains Limited】
Novametal USA released its October 2026 raw-material surcharges for stainless steel cold-drawn wire. The molybdenum average increased 1.0% from US$33.2230/lb to US$33.5558/lb, equivalent to approximately US$73,244/t and US$73,978/t. However, nickel and chromium averages declined 1.9% and 1.2%, respectively. Consequently, the 316 alloy surcharge fell from US$1.94/lb to US$1.92/lb, while 316L declined from US$1.98/lb to US$1.97/lb. After the energy surcharge rose from US$0.10/lb to US$0.12/lb, the total 316 surcharge remained unchanged at US$2.04/lb and 316L edged up to US$2.09/lb. SMM analysis: weaker nickel and chromium partly offset higher molybdenum costs, limiting downstream price transmission.
1 min ago
【Flash | Eaton Steel Raises Molybdenum Surcharges for October】
2 mins ago
【Flash | Eaton Steel Raises Molybdenum Surcharges for October】
Read More
【Flash | Eaton Steel Raises Molybdenum Surcharges for October】
【Flash | Eaton Steel Raises Molybdenum Surcharges for October】
Eaton Steel Bar Company released its October 2026 scrap and alloy surcharge schedule, raising the molybdenum component across all listed molybdenum-bearing grades. The moly surcharge for the 4000 series increased from US$9.49/cwt to US$9.77/cwt, equivalent to approximately US$209.22/t to US$215.39/t of steel. The 4600 series rose from US$15.18/cwt to US$15.64/cwt, while the 9260 grade increased from US$3.64/cwt to US$3.81/cwt. The gains ranged from about 3.0% to 4.7%. The scrap surcharge remained unchanged at US$14.50/cwt. SMM analysis: the October increase mainly came from alloy components, although the surcharge should not be treated as a direct molybdenum spot-price indicator.
2 mins ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)