15th Dec, 2015: North American Aluminum scrap prices declined on Index

Published: Dec 16, 2015 17:20 (GMT+8)
The daily North American aluminum scrap prices dropped on Tuesday, 15th December.

By Paul Ploumis (ScrapMonster Author)

December 16, 2015 04:40:40 AM

SPOKANE (Scrap Monster): The North American Aluminum scrap prices declined on ScrapMonster Price Index  as on December 15th, Tuesday.

1100 Scrap and 3003 Scrap prices were down by $0.02 per Lb each on Index. A down move of $0.02 per Lb was witnessed in 356 Aluminum Wheels and 6061 Extrusions. 5052 Scrap prices too dropped by $0.02 per Lb. 6063 Extrusions and 6063 Extrusions/Fe declined by $0.02 per Lb over the previous day.

The prices of Al/Cu Radiators and Aluminum Radiators dropped by $0.03 per Lb each. Al/Cu Radiators/Fe prices were down by $0.04 per Lb over the previous day. Aluminum Radiators/Fe prices went down by $0.02 per Lb. Aluminum Transformer prices too declined by $0.02 per Lb on Dec 15th.

Breakage 50% Recovery prices witnessed decline of $0.02 per Lb.

ALSO SEE Brass/Bronze Scrap Price List, Copper Scrap Price List

Chrome Wheels and MLC Clips prices dropped by $0.02 per Lb.

E.C Aluminum Wire prices too slipped by $0.02 per Lb.

The prices of Litho Sheets witnessed decline of $0.02 per Lb.

Old Cast and Painted Sliding prices declined by $0.02 per Lb each.

Old Sheet prices too were down by $0.02 per Lb on Dec 15th, 2015.

Mixed Aluminum Turnings, Zorba 90% NF and UBC prices dropped by $0.02 per Lb over the previous day.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)