Copper MMI Slumps 9%, Supply Cuts Don’t Help

Published: Dec 08, 2015 10:09 (GMT+8)
Our December copper MMI index fell 9% to 60 points.

by Raul de Frutos on DECEMBER 7, 2015

Our December copper MMI index fell 9% to 60 points.

Three-month copper on the London Metal Exchange hit fresh lows last month, trading as low as $4,444 a metric ton, the lowest level since May of 2009. In the face of low prices, more shutdowns were announced during the month of November but so far, they haven’t lifted prices at all.

In early November, Glencore announced that it would reduce its copper production more than expected. The company is now aiming to cut output by 455,000 metric tons by the end of 2017, 14% up from its previously announced figures. Glencore’s cuts came afterFreeport-McMoRan announced a pullback in production.

Toward the end of the month, 10 leading copper producers in China announced plans to cut output by 350,000 mt in 2016. In addition, producers urged Beijing to buy up excessive supply to combat falling prices. The State Reserves Bureau already said that it would buy aluminum, nickel, indium, and zinc.

But supply cuts haven’t been big enough to make a sustainable impact on the market. Moreover, there are still manny producers unwilling to cut production despite the low prices. The head of the world’s biggest copper miner, Codelco, said in November that they won’t cut copper production as prices slump, pointing to the fact that if the company suspends production then it would be difficult to restart, so they would rather try to lower costs. Also, there is skepticism about how many of the announced cuts will actually be made and how long they will last.

In addition, refined copper output in China rose 6.8 % in the first 10 months from the previous year. Meanwhile, disappointing Chinese import data increased demand concerns in November, contributing to the slump in prices. So far, supply cuts haven’t been enough to balance the other side of the equation: Excess material, shrinking Chinese demand and a strong dollar. Prices might have to come down farther before we see a turnaround.

Source:metalminer


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
3 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
3 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
3 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
3 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
3 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Read More
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile Metals announced that its second rig had arrived at Tribag–West Wedge in New Brunswick, Canada, with drilling expected to begin at Tribag in the coming days. Seven modelled electromagnetic targets are associated with the Tribag lead-zinc and West Wedge copper-lead-zinc occurrences. Wedge drilling continues in parallel. By September 21, the company had completed 18 holes totaling 4,934.50 metres of its 10,000-metre annual program. The conductors remain geophysical targets requiring drilling to establish their source.
3 hours ago