SMM Ranking by Metal Price Increase (Weekly)2015.12.04

Published: Dec 4, 2015 14:04
The followings are SMM Ranking by Metal Price Increase in the week ending Dec 4.
SHANGHAI,   Dec 4 (SMM) – The followings are SMM Ranking by Metal Price Increase in the   week ending Dec 4.
Base Metals
NameUnitLast Week's Average PricesThis Week's Average Prices+/- %
A00 aluminum ingotRMB/mt9,94810,1502.03%
#1 refined nickelRMB/mt67,56068,7801.81%
#1 refined copperRMB/mt34,45135,0181.65%
#1 lead ingotRMB/mt12,81012,9651.21%
#0 zinc ingotRMB/mt13,02212,924-0.75%
#1 tin ingotRMB/mt85,85084,800-1.22%
Source:SMM
Minor Metals
NameUnitLast Week's Average PricesThis Week's Average Prices+/- %
#0 cadmium ingot and barRMB/mt8,0508,2902.98%
Refined cobaltRMB/mt203,400207,4001.97%
Lithium metalRMB/mt440,000447,0001.59%
BerylliumRMB/kg5,7505,7500
#1 tungsten barRMB/kg1951950
#1 chromiumRMB/mt60,50060,5000
PotassiumRMB/mt90,00090,0000
#1 molybdenumRMB/kg1781780
Arsenic metalRMB/mt11,50011,5000
EMMRMB/mt9,6509,6500
NiobiumRMB/kg6256250
Titanium spongeRMB/kg46460
Silicon metalRMB/mt10,36010,350-0.10%
#1 magnesium ingotRMB/mt12,95012,900-0.39%
GalliumRMB/kg810804-0.74%
Germanium ingotRMB/kg8,6908,600-1.04%
Selenium powderRMB/kg134130-3.36%
Refined bismuthRMB/mt62,50060,400-3.36%
#2 antimony ingotRMB/mt32,80031,500-3.96%
IndiumRMB/kg1,3751,315-4.36%
TelluriumRMB/kg221211-4.52%
Source:SMM
Rare Earth
NameUnitLast Week's Average PricesThis Week's Average Prices+/- %
Europium oxideRMB/kg5956255.04%
Cerium metalRMB/mt28,50029,3002.81%
Neodymium oxideRMB/mt253,000260,0002.77%
Praseodymium-neodymium alloyRMB/mt337,200340,2000.89%
Terbium oxideRMB/kg2,4552,4750.81%
Didymium oxideRMB/mt265,300266,5000.45%
Dysprosium oxideRMB/kg1,3811,3850.29%
Praseodymium oxideRMB/mt310,000310,0000
Cerium oxideRMB/mt10,15010,1500
Battery grade misch metalRMB/mt135,000135,0000
Lanthanum metalRMB/mt29,50029,5000
Neodymium metalRMB/mt312,500312,5000
Lanthanum oxideRMB/mt10,65010,6500
Praseodymium metalRMB/mt480,000472,000-1.67%
Source:SMM
Precious Metals
NameUnitLast Week's Average PricesThis Week's Average Prices+/- %
GoldRMB/g221219-0.91%
PlatinumRMB/g190188-1.05%
SilverRMB/kg3,1843,150-1.07%
PalladiumRMB/g129127-1.24%
Source:SMM
Scraps
NameUnitLast Week's Average PricesThis Week's Average Prices+/- %
Aluminum extrusionRMB/mt7,7908,0503.34%
TenseRMB/mt8,2408,5003.16%
US #2 copperRMB/mt32,29032,8501.73%
Bare bright copperRMB/mt33,87034,1000.68%
US brass (in container)RMB/mt26,87027,0000.48%
Source:SMM


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
1 hour ago
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
Read More
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
On March 31, the National Grid announced that the Shaanxi-Henan ± 800 kV UHV DC project, the final project of the "three exchanges and nine direct" projects in the National "14th Five-Year" plan, with a total investment of 19 billion yuan.It starts in Yulin, Shaanxi, and ends in Kaifeng, Henan, passing through Shaanxi, Shanxi, and Henan provinces. The total length of the line is 728 kilometers, the transmission capacity is 8 million kilowatts, and it is planned to be completed and put into operation in 2028.
1 hour ago
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
1 hour ago
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
Read More
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
On March 31, the National Grid announced that the Panxi UHV AC project, the first UHV AC project to start construction during the "14th Five-Year Plan" of the National Grid, has a total investment of about 23.2 billion yuan. The project will pass through 12 counties (districts) in Liangshan, Yibin, and Leshan, build two 1000 kV substations in Panxi and Chuannan, and expand Tianfu South Station. The total length of the line is 994 kilometers, and it is expected to be completed and put into operation in 2028.
1 hour ago
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
20 hours ago
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
Read More
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
This week, against the backdrop of fluctuating upward copper prices, the secondary copper industry chain showed a complex situation in which extremely tight upstream raw material supply coexisted with persistent negative margins for downstream finished products. In the secondary copper rod market, SMM data showed that the operating rate fell further to 5.45% this week, down 0.38 percentage points MoM and 25.43 percentage points YoY
20 hours ago
SMM Ranking by Metal Price Increase (Weekly)2015.12.04 - Shanghai Metals Market (SMM)