Indian and US Steel Industries Fight to Get Back to Profitability

Published: Dec 03, 2015 15:17 (GMT+8)
Both the USA and India’s steel mills are running at less than capacity thanks to the worldwide steel surplus.

by Sohrab Darabshaw on DECEMBER 3, 2015

Both the USA and India’s steel mills are running at less than capacity thanks to the worldwide steel surplus. US steel mills continue to be buffeted by cheap, mostly Chinese imports and lukewarm demand and no one is willing to bet on when, or if, they will ever come back to full production.

On the other hand, the future of India’s steel industry is tied to the percentage of expenditures on infrastructure that the government is expected to provide. The difference between the two is that India’s economy is merely in revival mode, while the US economy is growing at a rapid pace.

Rating Agencies Weigh In

A recently released report by Fitch Ratings titled, “2016 Outlook: Indian Steel Sector,” says that increased spending on infrastructure projects, such as housing and smart cities is the key to the revival of India’s steel industry.

Indian steelmakers, however, have to face the onslaught of cheap imports just as their counterparts in the US do, especially imports from China. The difference is, the imports work, to an extent, in Indian producers’ favor, as opposed to how badly they harm US steelmakers.

In India, abundant steel only increases domestic demand in India as low prices and more supply are likely to spur government action as costly infrastructure investments are more likely to be seen as relative bargains.

“Spending by the Indian government on infrastructure will be the catalyst for any meaningful improvement in domestic steel demand. The agency expects India’s steel consumption to improve modestly by 7-8% in 2016,” according to the Fitch report.

No doubt, high imports and soft steel prices globally in 2016 might bring up sales in India, but that will still eventually result in far lower prices, meaning less profit for Indian steel producers despite more sales. Steel companies’ margins are likely to be lower in 2016 but could improve, incrementally, in 2017, supported by “(an) improving domestic demand and the imposition of safeguard duty on imports on certain steel products for 200 days,” according to the Fitch report.

The Effect of Tariffs and Duties

As with steelmakers worldwide, the prices of Indian steel dropped almost a quarter year-on-year as of the end of September. The imposition of a 20% duty on certain steel product imports, effective September 14, has saved the day for some Indian steel companies.

In a similar vein, another global ratings agency, Moody’s Investors Service, cautioned that failure to implement reforms in India could hamper investment amid weak global growth.

According to Vikas Halan, a Moody’s vice president and senior credit officer, a healthy 7.5% GDP growth for India for the fiscal year that will end in March 2017 (FY2017) and a pick-up in manufacturing activity will broadly support business growth.

The ratings agency expects upstream oil and gas companies to benefit from lower fuel subsidy burdens, although low crude and domestic natural gas prices will continue to hurt profitability.

Another Negative Outlook

The agency’s negative outlook for the steel industry reflects elevated leverage and an extended period of low prices due to continuing low steel import prices, while the negative outlook for metals and mining companies reflected bleak global commodity prices.

While India’s steelmakers are banking on growth to see them through these difficult times, one of the biggest challenges that the US industry faces is the growth of steel imports. Its best bet is to reduce  imports and pray that the domestic market will swing back to buying for US mills.

Earlier this year, steel companies including AK Steel, Nucor and U.S. Steel filed trade cases to stem the flow of steel products entering the US. The only silver lining was that steel imports into the US have started to come down on a year-over-year basis for the last five months.

Source:metalminer

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
43 mins ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
43 mins ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
1 hour ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
1 hour ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
1 hour ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
1 hour ago