Narada Power Net Profit Sets for 15%-45% Gain during Jan.-Sept.

Published: Oct 15, 2015 15:23
Narada Power is expected to achieve 128-161 million yuan ($ 20.1-25.3 million) in net profit in the first three quarters of 2015, up 15%-45% from a year ago, according to the company’s earnings foreca

SHANGHAI, Oct. 15 (SMM) – Narada Power is expected to achieve 128-161 million yuan ($ 20.1-25.3 million) in net profit in the first three quarters of 2015, up 15%-45% from a year ago, according to the company’s earnings forecast.  

In the third quarter, the company gained net profit of 47.38-80.7 million yuan, growing 35.31% YoY to 230.47%.

Anhui Huabo Renewable Resources Technology contributed 20-30 million yuan in net profit during Q3 after Narada Power acquired 51% stakes in the company. Net profit from those businesses, including backup power, storage power and motive lithium batteries used for new energy vehicles, posted a rise versus a year ago. However, business revenues from motive batteries registered large losses year on year because of fierce and persist price wars.  

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
12 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Read More
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
The Autonomous Bougainville Government said the Lloyds Panguna Metals & Energy Limited camp at the Panguna copper-gold mine was attacked on September 13. Personnel were assaulted and machinery was damaged in an arson attack. Authorities have not disclosed the extent of injuries or equipment losses. President Ishmael Toroama condemned the incident and said the government would continue pursuing the mine’s redevelopment.
12 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
12 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
Read More
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
According to Iranian media reports citing Seyed Mostafa Feiz, CEO of the National Iranian Copper Industries Company (NICICO), Iran’s geological copper ore resources rose to 24.5 billion tonnes from 22.2 billion tonnes at the start of the Iranian year, up 10.6%. Mineable (designable) reserves increased to 18.2 billion tonnes from 16.8 billion tonnes, while 198,462 metres of exploration drilling were completed in the first five months—about 40% of the 500,000-metre full-year target. At Miduk, mineable reserves rose 123% to 1.77 billion tonnes and geological resources increased 186% to 2.883 billion tonnes. The Sarcheshmeh cluster’s mineable reserves reached 7.7 billion tonnes at an average grade of 0.41%, with the mine’s operating permit extended through Iranian year 1429 (around 2050–51). Total material extracted during the period exceeded 153 million tonnes, up about 4% year on year; this figure includes sulphide ore, oxide material and waste rock, and is not copper production. The expanded resource and reserve base supports Iran’s longer-term development potential, but does not imply an immediate increase in supply.
12 hours ago
Narada Power Net Profit Sets for 15%-45% Gain during Jan.-Sept. - Shanghai Metals Market (SMM)