India scrap imports surged

Published: Aug 18, 2015 15:58 (GMT+8)
The scrap imports by India during the month of May this year increased sharply when compared with the previous month.

By  Paul Ploumis 18 Aug 2015  Last updated at  03:38:23 GMT

NEW DELHI (Scrap Monster): The scrap imports by India during the month of May this year increased sharply when compared with the previous month. The cumulative imports during the initial five-month period too were up year-on-year.

According to trade data, India’s scrap imports totaled 604,000 tons in May ‘15. This is higher by 4.2% when compared with the imports during the month before. The country’s scrap imports had totaled 580,000 tons during April this year.

During May ‘15, the US was the main exporter of scrap to India. The scrap imports from the US totaled 103,000 tons, accounting for nearly 17% of the total imports by India during the month. The scrap imports from the US during May this year surged higher by 374% when compared with the same month in previous year.

The second largest source of scrap imports by India was the UK. The scrap imports from the UK during the month totaled 84,000 tons, up by over 11.5% when compared with the previous year. The scrap imports from the UK constituted nearly 14% of the total Indian imports during May ‘15.

South Africa was the third largest ferrous scrap exporter to India during the month. The scrap imports from the country dropped significantly by 16.10% during the month. South Africa exported 81,000 tons of scrap into India during May ‘15.

The cumulative scrap imports by the country during the initial five-month period of the year totaled 2.63 million tons, significantly higher by 36.8% when compared with the imports during the corresponding period last year.

The annual scrap imports by the country during entire 2015 are projected at around 6.30 million tons.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
21 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
21 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)