US mills steel shipments take big leap in June

Published: Aug 17, 2015 10:24 (GMT+8)
The US steel mill shipments increased considerably during the month of June this year. The shipments were up 8.1% when compared with the previous month.

By  Paul Ploumis 14 Aug 2015  Last updated at  10:24:46 GMT

SPOKANE (Scrap Monster): The most recent report released by the American Iron and Steel Institute (AISI)- the association of North American steel producers indicates that the US steel mill shipments surged higher by 8.1% in June this year over the previous month. However, the shipments in May 2015 were down sharply by 6.4% when compared with the figures recorded during same month the previous year.

According to AISI, the US steel mills shipment for the month of June totaled 7,758,087 net tons, up 8.1% when compared with the total shipments of 7,175,211 net tons during May this year. Meantime, steel shipments in June this year witnessed considerable decline over the year. Steel shipments dropped by 6.4% during June ‘15, when compared with the 8,291,823 net tons shipment during June 2014.

The US steel shipments for the initial six-month period of the year declined by 9.8% to 43.980 million net tons as against 48.777 million tons shipment during the corresponding six-month period from January to June last year.

The products which witnessed sizable changes in shipments during the month of June when compared with the previous month were: hot dipped galvanized sheet and strip (up by 14.0%), hot rolled sheet (up by 12%) and cold rolled sheets (up 9%).

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis]  Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
15 hours ago
[SMM Analysis] Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
Read More
[SMM Analysis]  Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
[SMM Analysis] Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
Valterra Platinum’s 2010–2025 record shows how plant interruptions, inventory backlogs and changing reporting rules shaped refined output across South Africa and Zimbabwe. Platinum, palladium and rhodium followed different price cycles, so output alone could not explain value. Prices for ruthenium and iridium add context, though their separate production is undisclosed. Stronger prices and refining lifted H1 2026 results; lasting gains depend on safety, cost control and disciplined investment.
15 hours ago
[SMM Flash]  Jubilee Reviews Interest in Undeveloped Tjate PGM Project
16 hours ago
[SMM Flash] Jubilee Reviews Interest in Undeveloped Tjate PGM Project
Read More
[SMM Flash]  Jubilee Reviews Interest in Undeveloped Tjate PGM Project
[SMM Flash] Jubilee Reviews Interest in Undeveloped Tjate PGM Project
Jubilee Metals said in its 14 September operational update that several companies had expressed interest in its Tjate PGM project and that it was reviewing the approaches as part of a strategic review. Jubilee retained the South African asset after selling its other chrome and PGM operations; Miningmx reported that a disposal is under consideration as the company focuses on Zambian copper. A sale could transfer responsibility for developing Tjate. Expressions of interest are neither a sale agreement nor financing commitments, and no production timetable has been announced. Any contribution to PGM supply depends on future development decisions.
16 hours ago
[SMM Flash]  Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
16 hours ago
[SMM Flash] Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
Read More
[SMM Flash]  Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
[SMM Flash] Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
Sylvania Platinum said in its 15 September annual results that an updated geological model indicated chrome and PGM feed grades at its Thaba joint venture could be below original assumptions. Miningmx reported estimated shortfalls of 15–20% for PGM grades and 8–12% for chrome grades against earlier targets. Sylvania’s FY2026 group output of 95,885 4E PGM oz includes operations beyond Thaba. The partners are reviewing the mine plan, with an updated life-of-mine plan expected in three to six months. Management says Thaba remains profitable under current assumptions. Lower grades could reduce recoverable metal and project returns; the revised plan and profitability outlook remain subject to that review.
16 hours ago