SHFE 1601 Nickel Ends with a Cut of 1.43% (Aug. 14, 2015)

Published: Aug 14, 2015 17:34 (GMT+8)
SHFE 1601 nickel shifted to the most traded contract overnight, to start at RMB 83,350/mt and close at RMB 82,300/mt.

SHANGHAI, Aug. 14 (SMM) – SHFE 1601 nickel shifted to the most traded contract overnight, to start at RMB 83,350/mt and close at RMB 82,300/mt.

SHFE opened at RMB 82,720/mt for Friday trading session and then turned two-way with LME nickel. The contract moved between the 10 and 20-day moving averages for the whole day and finally ended at RMB 82,300/mt, off 1.43%. Trading volumes dropped 33,006 to 136,000 lots while positions grew 10,748 to 125,000.

SHFE 1509 nickel started Thursday evening at RMB 82,300/mt and then fell back, to close at RMB 81,740/mt.

On Friday, SHFE 1509 nickel opened at RMB 81,950/mt and hovered around RMB 82,000/mt before finishing at RMB 81,570/mt. Trading volumes declined 86,924 to 263,000 lots with positions down 400 to 113,000. SHFE 1601 turned to the most active contract but positions for SHFE 1509 nickel remained 113,000. Thus, the September nickel may fall further.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Mopani Copper posts 5,140 tonnes of cathode in June
1 hour ago
Mopani Copper posts 5,140 tonnes of cathode in June
Read More
Mopani Copper posts 5,140 tonnes of cathode in June
Mopani Copper posts 5,140 tonnes of cathode in June
Zambia's Mopani Copper Mines, now majority-owned by ZCCM-IH with IRH as partner, is rebuilding output: in June 2026 it processed 289,000 tonnes of ore and produced 5,140 tonnes of cathode against a 5,104-tonne target, running on own feed. The company secured a US$20 million Epiroc equipment order in April 2026. Zambia aims to lift national copper production to 3 million tonnes by 2031, and Mopani plans to scale from about 65,000 tonnes currently toward 110,000 and then 180,000 tonnes. Its ramp-up is a key gauge of supply growth across the African Copperbelt.
1 hour ago
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
1 hour ago
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
Read More
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
Spanish-language mining media report that BHP and Amazon have rolled out the first lower-emissions copper pilot at Escondida using Environmental Attribute Certificates, certifying emissions reductions within the mining setting rather than offsetting them elsewhere. Unveiled on 22 September 2026, the pilot leverages Escondida's renewable electricity and desalinated water, with Amazon retiring the certificates to match lower-carbon attributes to its AI infrastructure. Escondida produces about 1.2 million tonnes of copper annually as the world's largest mine, and the label is expected to serve growing demand for low-carbon metal procurement.
1 hour ago
Hindustan Copper Advances $776M Capex Funding via QIP, Bonds for Vision 2030 Expansion
19 hours ago
Hindustan Copper Advances $776M Capex Funding via QIP, Bonds for Vision 2030 Expansion
Read More
Hindustan Copper Advances $776M Capex Funding via QIP, Bonds for Vision 2030 Expansion
Hindustan Copper Advances $776M Capex Funding via QIP, Bonds for Vision 2030 Expansion
HCL's shareholders approved two fundraising mechanisms as the company implements its Vision 2030 expansion programme. The five-year plan targets higher mining capacity through existing mine expansion, new reserves and revival of legacy assets.
19 hours ago