SMM Zinc Market Daily Review (2015-8-13)

Published: Aug 14, 2015 09:09 (GMT+8)
SHFE 1510 zinc contract prices opened at RMB 14,900/mt Wednesday evening, then climbed to RMB 15,070/mt, and closed at RMB 15,020/mt.

SHANGHAI, Aug. 14 (SMM) –SHFE 1510 zinc contract prices opened at RMB 14,900/mt Wednesday evening, then climbed to RMB 15,070/mt, and closed at RMB 15,020/mt. SHFE 1510 zinc contract prices dipped to the 10-day moving average after opening Thursday as a large number of longs left the market but rallied later on and closed at RMB 14,980/mt, up RMB 355/mt or 2.43%. Trading volumes decreased 139,618 to 181,970 lots, and total positions decreased 5,806 to 149,464. SHFE 1509 zinc contract prices will test RMB 15,000/mt.  

#0 zinc prices were between RMB 15,170-15,220/mt, RMB 270-330/mt above SHFE 1510 zinc contract prices Wednesday. #1 zinc prices were RMB 15,120-15,140/mt. Spot premiums of imported #0 zinc were RMB 220-240/mt against SHFE 1510 zinc contract prices. SHFE 1510 zinc contract prices opened at RMB 15,005/mt, and dipped to as low as RMB 14,700/mt, and closed at RMB 14,845/mt. Smelters increased supply, growing registered #0 zinc supply and weighing on spot premiums. Cargo holders began to sell imported goods for future delivery, while downstream buying interest was weak, with trading muted. Spot premiums were RMB 10+250-300/mt in the afternoon, with overall transactions quiet.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
9 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
9 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
13 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
13 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
13 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
13 hours ago