[Al Price] SHFE Aluminum Ends with Slim Gains (Aug. 11, 2015)

Published: Aug 11, 2015 15:59
SHFE 1510 aluminum fluctuated between the 5-day and 10-day moving averages after opening at RMB 12,080/mt on Tuesday.

SHANGHAI, Aug. 11 (SMM) – SHFE 1510 aluminum fluctuated between the 5-day and 10-day moving averages after opening at RMB 12,080/mt on Tuesday. The contract touched a session high of RMB 12,110/mt, but then fell back to RMB 12,010/mt as Chinese yuan softened against the US dollar considerably after the PBOC announced notice on RMB exchange rate policy. Finally, SHFE 1510 aluminum ended up RMB 75/mt or 0.63% at RMB 12,040/mt. Positions were down 6,170 lots to 147,000 lots. The contract should continue encountering resistance at the 10-day moving average in the short term.  







Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
BHP Submits Chile Copper Ore Expansion Plan; LME Copper and SHFE Copper Both Closed Lower Overnight [SMM Copper Morning Meeting Summary]
2 mins ago
BHP Submits Chile Copper Ore Expansion Plan; LME Copper and SHFE Copper Both Closed Lower Overnight [SMM Copper Morning Meeting Summary]
Read More
BHP Submits Chile Copper Ore Expansion Plan; LME Copper and SHFE Copper Both Closed Lower Overnight [SMM Copper Morning Meeting Summary]
BHP Submits Chile Copper Ore Expansion Plan; LME Copper and SHFE Copper Both Closed Lower Overnight [SMM Copper Morning Meeting Summary]
SMM Morning Meeting Summary: Overnight, LME copper opened at $12,724.5/mt. In early trading, it fluctuated upward to a high of $12,829.5/mt, after which the center of copper prices shifted straight downward to a low of $12,721/mt. It then fluctuated upward in a pullback and finally closed at $12,780/mt, down 1.07%. Trading volume reached 17,000 lots, and open interest stood at 293,000 lots, down 8,255 lots from the previous trading day, mainly due to longs reducing positions. Overnight, the most-traded SHFE copper 2604 contract opened at 99,120 yuan/mt. In early trading, it rose to 99,530 yuan/mt, then fluctuated downward all the way to a low of 98,900 yuan/mt. Afterwards, the center of copper prices moved upward and finally closed at 99,140 yuan/mt, down 0.92%. Trading volume reached 27,700 lots, and open interest stood at 177,000 lots, down 1,993 lots from the previous trading day, mainly due to longs reducing positions.
2 mins ago
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
12 hours ago
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Read More
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Data released by the Kazakhstan Bureau of Statistics showed that Kazakhstan's copper cathode production in January-February 2026 fell 9.1% YoY.Copper Cathode: February 2026 production was 35,625 mt, down 7.8% MoM; total production in January-February was 74,266 mt, down 9.1% YoY.
12 hours ago
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
12 hours ago
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
Read More
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
HBIS Resources (000923) announced on March 17 that the Limpopo Province of South Africa, where its subsidiary Palabora Copper (Pty) Ltd. is located, and the neighboring Mpumalanga Province had been hit by the most severe flooding disaster since 2000. As runoff from the open pit and surrounding catchment areas surged into the company’s mine workings, some tunnels in Phase I and Phase II of the copper project were flooded, causing some critical facilities to be submerged (with no casualties). As the operating area of Copper Phase II is located at a deeper level, dewatering has progressed relatively slowly, and dewatering operations are still underway, with completion expected in early April.
12 hours ago