[Metal Price] Metals and Energy Technical Report - august 07, 2015 : Angel Commodities

Published: Aug 7, 2015 13:10
Intraday Strategy: Sell MCX Aug Zinc between 119.90 – 120, SL- 121, Target-118 / 117.80

By   07 Aug 2015  Last updated at  00:45:46 GMT

Intraday Strategy: Sell MCX Aug Zinc between 119.90 – 120, SL- 121, Target-118 / 117.80

Morning Technical Levels for Metals and Energy

CommodityExchangeContract TrendS2S1LTPR1R2
Gold  MCXOctSideways24550 24650 24788 24880 25000
Spot Gold Sideways1078  1082 1088 1092 1097
Gold Hedge  NCDEX SeptSideways22190 22290 22414 22490 22610
Silver  MCX Sept Sideways33100 33400 33708 34000 34200
Spot SilverSideways14.40 14.55 14.67 14.80 14.90
Silver Hedge  NCDEX Aug Sideways29600 29900 30210 30510 30702
 Base Metal
 Copper Down5085 5130 5165 5195 5240
 Copper  MCX Aug Down326 329  331.15 333 336
 Zinc  MCX Aug Down117.00 118.00 118.95 120.00 121.00
 Lead  MCXAug Down107.00 108.00 108.90 110.00 111.00
 Aluminium  MCX Aug Down98.50 99.50 100.55 101.50 102.50
 Nickel MCX Aug Down 680  688 694.1 705 715
 Energy
 Crude Oil  MCX AugSideways2770  2810 2847 2890 2940
 Crude Oil  NYMEX SeptSideways43.50 44.20 44.77 45.45 46.20
 Crude Oil  NCDEX AugSideways2870  2910 2945 2980 3040
 Brent Crude OilMCX AugSideways3165  3210 3241 3285 3335
 Brent Crude OilICE SeptSideways48.40 49.10 49.65 50.30 51.10
 Natural GasMCX AugSideways176  178 180.2 182 184

Recommendations

Zinc MCX Aug Contract

Intraday Strategy: Sell MCX Aug Zinc between 119.90 – 120, SL – 121, Target – 118 / 117.80

Gold MCX Oct Contract

Intraday Strategy: Sell MCX Oct Gold between 24850 – 24900, SL – 25000, Target – 24650 / 24620

Courtesy : Angel Commodities

Disclaimer: The information and opinions contained in the document have been compiled from sources believed to be reliable. The company does not warrant its accuracy, completeness and correctness. The document is not, and should not be construed as an offer to sell or solicitation to buy any commodities. This document may not be reproduced, distributed or published, in whole or in part, by any recipient hereof for any purpose without prior permission from "Angel Commodities Broking (P) Ltd". Your feedback is appreciated on commodities@angelbroking.com

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
21 hours ago
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
Read More
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis: The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product]
21 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
22 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
Read More
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
22 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
22 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Read More
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Recently, the 500 kV transmission and transformation project of Jiri (Kusha II) was officially approved by the Energy Bureau of Inner Mongolia Autonomous Region, marking a good start for the power grid construction of Ordos City in the first year of the 14th Five-Year Plan. The project is located in the territory of Hangjin Banner, with a total investment of 1.52554 billion yuan. It is a key hub project to ensure the output and consumption of new energy power in the northwestern region of Hangjin Banner. The project plans to build one 500 kV substation and about 194 km of 500 k V lines, which will pass through Hangjin Banner and Dalad Banner.
22 hours ago