[Precious Metal] Coeur Raises 2015 Production Guidance About 2%

Published: Aug 5, 2015 17:12
Coeur Mining, Inc. (NYSE: CDE), a top-10 silver producer and also significant gold miner, trimmed its loss in the second quarter despite lower prices received for metals.

By  Paul Ploumis 05 Aug 2015  Last updated at  05:32:15 GMT

(Kitco News) - Coeur Mining, Inc. (NYSE: CDE), a top-10 silver producer and also significant gold miner, trimmed its loss in the second quarter despite lower prices received for metals, with the company upping output and cutting costs.

Coeur reported a net loss of $16.7 million, or 12 cents per share, compared to a loss of $43.1 million, or 42 cents, in the second quarter of 2014.

Not counting special items, the adjusted loss for the April-June period was $14.5 million, or 11 cents per share, compared to $21.5 million, or 21 cents, a year ago.

Revenue of $166.3 million was the highest since the third quarter and up from $164.6 million in the second quarter of 2014.

Adjusted costs per silver-equivalent ounce were $12.56, down from $13.71 in the first quarter and $14 in the second quarter of 2014.  Adjusted all-in sustaining costs declined to $16.60, the lowest since Coeur began reporting this metric in 2013, down from $17.66 in the first quarter and $19.10 a year ago.

"In the second quarter, we achieved the strongest financial performance in two years despite the weakest realized silver and gold prices over this time frame," said Mitchell J. Krebs, Coeur's president and chief executive officer. "With nearly every mine outperforming initial cost and production targets, we are raising our production guidance and lowering our cost guidance for 2015. The notable exception is San Bartolomé, where July production was impacted by political disruptions in Bolivia, but is now fully operational.”

Second-quarter silver production was 4.3 million ounces and gold production was 80,855 ounces, or 9.1 million silver-equivalent ounces, a 12% year-on-year increase. However, with the downturn in prices of precious metals, the average realized price fell to $16.23 for an ounce of silver from $19.60 a year ago. The average realized gold price was $1,179, down from $1,277.

Coeur raised its 2015 production guidance by approximately 2% to between 33.1 million and 35.9 million silver-equivalent ounces. This consists of 14.7 million to 15.8 million silver ounces and 306,000 to 335,000 gold ounces, the company said.

Coeur also said that it is lowering its guidance for all-in sustaining costs per silver-equivalent ounce by approximately 3% to between $17 and $18. The revised guidance is mainly due to stronger-than-planned production and lower-than-expected costs at Palmarejo in Mexico and the Kensington gold mine in Alaska, partially offset by lower-than-expected production at San Bartolomé.

Coeur said it obtained a five-year, $100 million senior secured term loan and repaid a $50 million short-term bridge loan during the second quarter. This raised total debt to $547.7 million as of June 30, including $426.2 million in senior unsecured notes due in 2021. Cash, cash equivalents, and short-term investments totaled $205.9 million at the end of the second quarter, yielding a net debt balance of $341.8 million, a 2% increase compared to March 31.

Courtesy: Kitco News


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
1 hour ago
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
Read More
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
[SMM Aluminum Flash News] The Guangxi Qiangqiang Carbon-Based New Materials prebaked anode project, with an annual capacity of 600,000 mt, officially commenced construction in April 2025 and is expected to begin trial production in July 2026. The first calcining furnace is estimated to start production by the end of March; the roasting furnace is expected to start production by the end of May, with the forming workshop producing the first green anode, marking the project’s full integration; and the first baked anode is expected to be produced by the end of July.
1 hour ago
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
1 hour ago
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
Read More
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
According to Alba’s official website on March 15, Alba has initiated a controlled and safe shutdown of Production Lines 1, 2, and 3, involving capacity equivalent to 19% of its total capacity of 1.623 million mt, with the aim of optimizing the utilization of Alba’s existing raw material inventory and prioritizing the operational stability of Production Lines 4, 5, and 6.
1 hour ago
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
1 hour ago
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
Read More
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
[SMM Aluminum Express News] Indonesia's Minister of Energy and Mineral Resources (ESDM), Bahlil Lahadalia, held a bilateral meeting with Japan's Minister of Economy, Trade and Industry (METI), Ryosei Akazawa, on the sidelines of the Indo Pacific Energy Security Ministerial and Business Forum (IPEM) in Tokyo, Japan, March 15, 2026. A key outcome was the signing of a Memorandum of Cooperation in two strategic areas: 1. Critical minerals (focusing on secure, sustainable supply chains for nickel, bauxite, lithium, rare earths, and others essential for batteries, EVs, and green tech). 2. Nuclear energy (covering technology transfer, human resource development, safety standards, regulatory alignment, and potential collaboration on small modular reactors or other advanced nuclear solutions).
1 hour ago
[Precious Metal] Coeur Raises 2015 Production Guidance About 2% - Shanghai Metals Market (SMM)