[Steel Output]US Raw Steel production plummets to 1,753,000 net tons: AISI

Published: Jul 29, 2015 08:59 (GMT+8)
United States domestic raw steel production plummeted by 8.4% year-on-year to 1,753,000 net tons in the week ended July 18.

UNITED STATES July 28 2015 5:11 PM

NEW YORK (Scrap Register):  United States domestic raw steel production plummeted by 8.4% year-on-year to 1,753,000 net tons in the week ended July 18, while the capability utilization rate was 73.3 percent, the American Iron and Steel Institute (AISI).

According to AISI, production was 1,914,000 net tons in the week ended July 18, 2014 while the capability utilization then was 79.6 percent.

Production for the week ended July 18, 2015 is up 0.7 percent from the previous week ended July 11, 2015 when production was 1,740,000 net tons and the rate of capability utilization was 72.8 percent.

Adjusted year-to-date production through July 18, 2015 was 48,747,000 net tons, at a capability utilization rate of 72.5 percent.

That is down 7.7 percent from the 52,790,000 net tons during the same period last year, when the capability utilization rate was 77.6 percent.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis]  Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
17 hours ago
[SMM Analysis] Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
Read More
[SMM Analysis]  Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
[SMM Analysis] Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
Valterra Platinum’s 2010–2025 record shows how plant interruptions, inventory backlogs and changing reporting rules shaped refined output across South Africa and Zimbabwe. Platinum, palladium and rhodium followed different price cycles, so output alone could not explain value. Prices for ruthenium and iridium add context, though their separate production is undisclosed. Stronger prices and refining lifted H1 2026 results; lasting gains depend on safety, cost control and disciplined investment.
17 hours ago
[SMM Flash]  Jubilee Reviews Interest in Undeveloped Tjate PGM Project
17 hours ago
[SMM Flash] Jubilee Reviews Interest in Undeveloped Tjate PGM Project
Read More
[SMM Flash]  Jubilee Reviews Interest in Undeveloped Tjate PGM Project
[SMM Flash] Jubilee Reviews Interest in Undeveloped Tjate PGM Project
Jubilee Metals said in its 14 September operational update that several companies had expressed interest in its Tjate PGM project and that it was reviewing the approaches as part of a strategic review. Jubilee retained the South African asset after selling its other chrome and PGM operations; Miningmx reported that a disposal is under consideration as the company focuses on Zambian copper. A sale could transfer responsibility for developing Tjate. Expressions of interest are neither a sale agreement nor financing commitments, and no production timetable has been announced. Any contribution to PGM supply depends on future development decisions.
17 hours ago
[SMM Flash]  Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
17 hours ago
[SMM Flash] Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
Read More
[SMM Flash]  Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
[SMM Flash] Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
Sylvania Platinum said in its 15 September annual results that an updated geological model indicated chrome and PGM feed grades at its Thaba joint venture could be below original assumptions. Miningmx reported estimated shortfalls of 15–20% for PGM grades and 8–12% for chrome grades against earlier targets. Sylvania’s FY2026 group output of 95,885 4E PGM oz includes operations beyond Thaba. The partners are reviewing the mine plan, with an updated life-of-mine plan expected in three to six months. Management says Thaba remains profitable under current assumptions. Lower grades could reduce recoverable metal and project returns; the revised plan and profitability outlook remain subject to that review.
17 hours ago