[Au Demand] China Gold Demand Cools

Published: Jul 28, 2015 13:51
Gold bullion recovered a $10 loss in London on Monday to trade just shy of $1100 per ounce – a new 5-year low when first hit last week.

By  Paul Ploumis 28 Jul 2015  Last updated at  01:15:42 GMT

EDGWARE (Scrap Monster):Gold bullion recovered a $10 loss in London on Monday to trade just shy of $1100 per ounce – a new 5-year low when first hit last week – as Western stock markets fell following the 2nd heaviest-ever drop in China's main equity index.

The Shanghai Composite dropped 8.5%, reversing half of its recent bounce from June's 35% plunge.

Eurozone stock markets fell over 2% as the single currency rose on the FX market, pushing the price of gold bullion for German, French and other  monetary union citizens back towards Friday's new 2015 lows at €982 per ounce.

Wholesale gold priced in Dollars had earlier dipped below $1090 per ounce after news of stronger-than-expected orders for durable goods in the US, but rallied with silver prices to stand unchanged by the close of London dealing on Monday.

"Gold managed a late rally on Friday evening on the back of a weakening Dollar and end of week short covering," says London brokerage Marex Spectron in a note.

"It is possible," says bullion bank and London market maker Scotia Mocatta, "that we will see a small relief rally in the coming days, but ultimately the risk is to the downside."

"The latest CFTC [positioning] data show the extent to which gold has lost its lustre," says Chinese-owned ICBC Standard Bank's London team, "with the net speculative position still long, albeit not by much, with speculative shorts climbing to a fresh record high while longs trudge towards the exit.

"While the record short position opens up the scope for a significant short covering rally," says ICBC Standard Bank, "the trigger seems somewhat elusive.

"Physical purchasing activity out of Asia is also backing off and appears to be waiting for a price floor to emerge while ETF liquidation is adding to the downwards pressure."

The giant SPDR Gold Trust (NYSEArca:GLD) has now shed 31 tonnes this month so far from the bullion needed to back its shares, the fastest pace since December 2013 capped that year's huge outflow of metal.

Net imports of gold bullion to China through Hong Kong, adjusted for re-exports, fell in June to a 10-month low of 22.1 tonnes, Bloomberg reports.

Gross imports to China were "the lowest since June 2011 according to the latest Hong Kong customs data," says Jonathan Butler at Japanese conglomerate Mitsubishi Corporation, "support[ing] our thesis that physical gold demand in China is cooling due to lower jewellery offtake amid the economic slowdown and recent stock market rout."

Courtesy: www.bullionvault.com


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
13 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
13 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
13 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
Read More
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
13 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
15 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Read More
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Epiroc has secured an approximately SEK610 million (US$64 million) order from MMG Limited and its mining contractors, China Huaye and 23MCC, for underground mining equipment to support the expansion of the Khoemacau Copper Mine in Botswana. The order includes face drilling rigs, production drilling rigs, cable-bolting rigs, loaders and underground mine trucks, together with remote-control systems, spare parts, training and on-site technical support. The equipment will support MMG’s ongoing Khoemacau expansion, which is designed to increase annual production capacity from approximately 60,000 tonnes to 130,000 tonnes of copper metal in concentrate. The project includes construction of a new 4.5 Mt/y processing plant, which will lift total milling capacity to more than 8 Mt/y, alongside development of Zone 5 North, Mango and Zeta North-East. First copper concentrate from the expansion is expected in H1 2028. Epiroc said delivery of the new underground fleet will begin in Q4 2026 and is expected to be completed by Q2 2028, broadly aligning with the expansion schedule. The ordered fleet includes Boomer face drilling rigs, Simba production drilling rigs, Cabletec cable-bolting rigs, Scooptram loaders and Minetruck underground trucks, with several units equipped for automation and remote-control operation. The equipment order represents another execution milestone for the already-approved Khoemacau expansion, rather than a new production target. With procurement progressing and equipment deliveries scheduled through Q2 2028, the project continues to advance toward MMG’s planned increase in copper-in-concentrate capacity to 130,000 tonnes per year. The expansion represents a significant planned increase in Khoemacau’s copper production capacity in Botswana’s Kalahari Copper Belt.
15 hours ago