[Base Metals] Metals and Energy Technical Report - July 17, 2015 : Angel Commodities

Published: Jul 17, 2015 17:43
​Intraday Strategy: Sell MCX July Lead between 116.60 - 116.70, SL - 117.50, Target - 115.10

By   17 Jul 2015  Last updated at  02:03:38 GMT

Intraday Strategy: Sell MCX July Lead between 116.60 - 116.70, SL - 117.50, Target - 115.10

Morning Technical Levels for Metals and Energy

CommodityExchangeContract TrendS2S1LTPR1R2
Gold  MCX  Aug  Down 25540 25650 25771 25860 25980
Spot Gold  Down 1134 1139 1144.40 1149.50 1155
Gold Hedge  NCDEX  July  Down 23120 23200 23276 23360 23450
Silver  MCX  Sept  Down 33900 34150 34504 34750 35100
Spot Silver Down 14.7214.85 15.01 15.13 15.28
Silver Hedge  NCDEX  Aug  Down 30400 30600 30861 31050 31300
 Base Metal
 Copper  LME Down 5485 5515 5561 5595 5635
 Copper  MCX  Aug  Down 351  353 356.30 359 362
 Zinc  MCX  July Down 129.60 130.40 131.30 132.00 132.90
 Lead  MCX July  Down 114.30 115.10 116.00 116.70 117.50
 Aluminium  MCX  July  Down 105.20 106.00 106.90 107.50 108.30
 Nickel MCX  July  Down 715  725 736.10745 754
 Energy
 Crude Oil  MCX  July  Down 3190 3220 3255 3280 3320
 Crude Oil  NYMEX  Aug  Down 50.00 50.40 50.90 51.30 51.90
 Crude Oil  NCDEX  July  Down 3230 32653303 3330 3370
 Brent Crude OilMCX July Down 3550 3610 3662 3715 3765
 Brent Crude OilICE Aug Down 55.80 56.40 56.96 57.50 58.10
 Natural GasMCX July Down 174 178 181.40 183 186

Recommendations

Lead MCX July Contract

Intraday Strategy: Sell MCX July Lead between 116.60 - 116.70, SL - 117.50, Target - 115.10

Crude Oil MCX July Contract

Intraday Strategy: Sell MCX July Crude oil between 3280 – 3290, SL – 3320, Target – 3220

Courtesy : Angel Commodities

Disclaimer: The information and opinions contained in the document have been compiled from sources believed to be reliable. The company does not warrant its accuracy, completeness and correctness. The document is not, and should not be construed as an offer to sell or solicitation to buy any commodities. This document may not be reproduced, distributed or published, in whole or in part, by any recipient hereof for any purpose without prior permission from "Angel Commodities Broking (P) Ltd". Your feedback is appreciated on commodities@angelbroking.com

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
22 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
22 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10