Tokyo Steel scrap purchasing prices up by ¥ 500/ton

Published: Jun 16, 2015 18:50 (GMT+8)
The country’s top electric steel producer- Tokyo Steel Manufacturing has increased purchasing prices for all grades of ferrous scrap delivered to its entire works.

By Paul Ploumis 16 Jun 2015 Last updated at 05:12:42 GMT

TOKYO (Scrap Monster): The country’s top electric steel producer- Tokyo Steel Manufacturing has increased purchasing prices for all grades of ferrous scrap delivered to its entire works. According to company website, the purchasing prices are being increased by Yen 500 per mt effective Tuesday, June 16th, 2015.

The hike in scrap purchasing prices is the second during this month. Earlier, Tokyo Steel had raised the scrap purchasing price for all grades delivered to its works on June 3rd by ¥ 500/ton. After announcement, H2 scrap purchasing prices at various works averaged between ¥ 25,000/ton and ¥ 27,000/ton.

The scrap purchasing prices at Okayama works in Western Japan will be increased by ¥ 500/ton to ¥ 25,500/ton and those in Kyushu works in Western Japan will be ¥ 26,000/ton.

Tokyo Steel’s scrap purchasing prices in Tahara works in Central Japan will be ¥ 26,000/ton, while those in Takamatsu steel center on Shikoku Island will be hiked by ¥ 500/ton to ¥ 25,000/ton.

The scrap purchasing prices at Utsunomiya works in north of Tokyo will now be ¥ 27,000/ton ($214.90/ton).

The rise in scrap export prices has forced Tokyo Steel to increase its scrap purchasing prices, sources say.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
Sep 25, 2026 16:02 (GMT+8)
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
Read More
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
[SMM Gold Flash] Lake Victoria Gold reported new metallurgical testwork for weathered ore at Area C of its fully permitted Imwelo Gold Project in Tanzania. Attrition scrubbing followed by desliming increased 24-hour gold extraction from 49.99% to 84.54% in agitated-leach testing. Bottle-roll recovery reached 88.15% after pretreatment, while gravity-recoverable gold also increased. The work was conducted by Nesch Mintech Tanzania in Mwanza. The company has identified attrition scrubbing and desliming as the preferred pretreatment route for further optimisation of the clay-rich near-surface material. Lake Victoria Gold says the results complement earlier work on deeper material, where recoveries of approximately 96–97% were reported. Importantly, the reported recoveries relate to tested pretreated fractions and do not yet represent overall whole-ore plant recovery; further mass-balance and optimisation work is planned.
Sep 25, 2026 16:02 (GMT+8)
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
Sep 25, 2026 15:58 (GMT+8)
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
Read More
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
[SMM Gold Flash] Aurum Resources reported new assay results from 22 diamond holes totalling 6,172.8 metres at the BST1 deposit at its Boundiali Gold Project in Côte d’Ivoire. The results include 2.63 metres at 76.74 g/t gold from 195.2 metres, including 1.3 metres at 155 g/t, together with 24 metres at 6.31 g/t from 108 metres, including 7 metres at 19.25 g/t. Several intersections extend beyond the existing BST1 resource envelope. The results will feed into Aurum’s planned Boundiali Mineral Resource update targeted for early Q4 2026. The company says mineralisation remains open along strike and at depth, while drilling continues across the project. The results are therefore an exploration and resource-growth development rather than additional production. Boundiali currently has a 3.22-million-ounce JORC Mineral Resource, while Aurum is advancing a definitive feasibility study.
Sep 25, 2026 15:58 (GMT+8)
Platinum Shows Stronger Inflation and Real-Rate Linkages Than Gold, Study Finds
Sep 25, 2026 15:52 (GMT+8)
Platinum Shows Stronger Inflation and Real-Rate Linkages Than Gold, Study Finds
Read More
Platinum Shows Stronger Inflation and Real-Rate Linkages Than Gold, Study Finds
Platinum Shows Stronger Inflation and Real-Rate Linkages Than Gold, Study Finds
[SMM Gold & PGM Flash] A new study published in the Journal of Commodity Markets finds that platinum has exhibited broader and more persistent co-movement with inflation and real interest rates than gold. Researchers Arusha Cooray and İbrahim Özmen examined monthly data from July 1999 through December 2024 across the US, Germany, Italy, France, Switzerland and the Netherlands, using turning-point analysis, wavelet coherence and time-varying Granger-causality methods. The study found gold’s macroeconomic relationships were comparatively weaker and more fragmented, while platinum and silver showed broader synchronization, particularly in the US and Germany.​ The researchers attribute platinum’s stronger macroeconomic sensitivity in part to its substantial industrial exposure, meaning its price reflects not only monetary conditions but also manufacturing activity, investment and supply constraints. The findings do not establish platinum as a universally superior inflation hedge: the relationships varied across countries, periods and monetary-policy regimes. Instead, the study highlights a fundamental difference between the metals, with gold’s broader monetary and defensive role producing a different response to inflation and real-rate conditions.
Sep 25, 2026 15:52 (GMT+8)