US raw steel production posts 2.7% weekly drop

Published: May 12, 2015 15:37
As per the statistics released by the American Iron and Steel Institute (AISI), the raw steel production by the country declined during the week ended May 9th, 2015.

 Author: Paul Ploumis12 May 2015 Last updated at 01:45:02 GMT

 
ALBANY (Scrap Monster): As per the statistics released by the American Iron and Steel Institute (AISI), the raw steel production by the country declined during the week ended May 9th, 2015. The raw steel output has declined for the first time after rising continuously for four weeks in a row.
 
The total raw steel output during the week ending May 9th was 1,665,000 net tons. The AISI data indicates that the US raw steel production has dropped by 2.7% during the week. This is in comparison with the previous week (ie., the week ended May 2nd)  production figures of 1,712,000 net tons. Also, the weekly output represents a sharp decline of 10.5% in comparison with production of 1,860,000 net tons during same week the previous year.
 
The capability utilization rate of US steel makers was 70.4% during the week ended May 9th, 2015.
 
The capacity utilization rate has declined marginally when compared to 72.4% during the previous week (ie., the week ending May 2nd). However, capacity utilization was considerably lower when compared with the rate of 77.3% during same week the previous year.
 
 The region-wise comparative weekly production figures are provided below:-    

Region

Steel production (in ‘000 nt)

% Change

Week ended May 2nd

Week ended May 9th

North East

217

221

+1.84

Great Lakes

650

610

-6.15

Southern

546

556

+1.83

Western

90

85

-5.56

Midwest

209

193

-7.66

 
The American Iron and Steel Institute (AISI) is an association of North American steel producers. AISI's member companies represent over three quarters of both U.S. and North American steel capacity.
 
AISI determines its weekly raw steel production data based on weekly data from 50% of the domestic industry and estimates the rest using monthly production data.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Sep 09)
2 hours ago
Data: SHFE, DCE market movement (Sep 09)
Read More
Data: SHFE, DCE market movement (Sep 09)
Data: SHFE, DCE market movement (Sep 09)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 09 Sep , 2026
2 hours ago
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
2 hours ago
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
Read More
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
Cobre Limited announced on September 9 that its Sierra Atacama operation in Chile has signed ore-purchase agreements with two third-party copper oxide miners in the Antofagasta region, with deliveries expected to ramp up from Q4 2026. The agreements are expected to supply approximately 50,000–75,000 tonnes of oxide ore per month grading 1.0–1.5% total copper, adding around 300 tonnes per month of copper cathode production.​ The additional production will be processed through Sierra Atacama’s existing SX-EW plant, which has installed copper cathode capacity of approximately 20,000 tonnes per year and is currently operating below nameplate capacity. As the purchased ore does not require Cobre to incur its own mining and development costs, the company said incremental costs will primarily comprise the ore purchase price and variable processing costs, including acid, power and reagents. Higher throughput is also expected to spread the plant’s fixed costs over a larger production base.​ The approximately 300 tonnes per month of additional cathode will be incremental to Cobre’s previously announced production targets, which remain unchanged. The company is continuing to stabilise underground production while preparing to transition toward a larger open-pit operation from 2027. Cobre said negotiations with additional regional ore suppliers are also underway, potentially providing further feed for the under-utilised SX-EW facility.​ The agreements represent a near-term increase in copper cathode supply from Sierra Atacama without requiring additional mining development or new processing capacity. At the initial expected rate, the third-party feed could contribute approximately 3,600 tonnes of additional cathode on an annualised basis. More importantly, it should raise utilisation of the existing SX-EW plant ahead of Cobre’s planned transition to expanded open-pit production in 2027. Further ore-supply agreements would provide additional upside to plant utilisation and cathode output.
2 hours ago
Eldorado Produces First Copper-Gold Concentrate at Skouries, Grid Connection Expected in September
2 hours ago
Eldorado Produces First Copper-Gold Concentrate at Skouries, Grid Connection Expected in September
Read More
Eldorado Produces First Copper-Gold Concentrate at Skouries, Grid Connection Expected in September
Eldorado Produces First Copper-Gold Concentrate at Skouries, Grid Connection Expected in September
Eldorado Gold announced on September 8 that its wholly owned Skouries project in northern Greece has produced its first copper-gold concentrate, marking another major step in the transition from construction to operations. Commercial production remains targeted for the fourth quarter of 2026.​ First concentrate was produced as part of the ongoing commissioning and ramp-up of the processing plant, following the introduction of first ore to the crusher in July. Key systems including crushing, grinding, flotation and tailings thickening are now operating successfully. The project currently has an ore stockpile exceeding 4.6 million tonnes above reserve grade, sufficient to support more than seven months of processing throughput and concentrate production.​ Temporary on-site power generation continues to support early operations, while connection to Greece’s national power grid is expected in September, subject to final inspections, testing and installation of metering equipment by the transmission authority.​ Skouries is expected to produce an average of 67 million lb of copper and 140,000 oz of gold annually over its mine life.​ The production of first concentrate confirms that Skouries has moved into the processing ramp-up stage after several years of construction. Attention will now shift to the pace of plant ramp-up, completion of the national grid connection and whether Eldorado can achieve commercial production as scheduled in Q4 2026.
2 hours ago
US raw steel production posts 2.7% weekly drop - Shanghai Metals Market (SMM)