US steel import permit applications drop sharply in Apr 2015

Published: May 11, 2015 13:42 (GMT+8)
According to American Iron and Steel Institute (AISI), the steel import permit applications totaled 3.294 million NT in April this year, 12% lower when compared with the previous month.

Author: Paul Ploumis
11 May 2015 Last updated at 02:00:49 GMT
ALBANY (Scrap Monster): According to American Iron and Steel Institute (AISI), the steel import permit applications totaled 3.294 million NT in April this year, 12% lower when compared with the previous month. The steel import permit applications had totaled 3.761 million NT during March ‘15.

Import permit tonnage for finished steel in April was 2.761 million NT, down 13% from the final imports total of 3.186 million NT in March. For the first four months of 2015 (including April SIMA and March final), total and finished steel imports were 15.015 million NT and 12.248 million NT, respectively, up 12% and 26% from the same period in 2014. The estimated finished steel import market share in April was 31%.

Finished steel products that witnessed huge rise in April permits when compared with March final imports were: tool steel (up 72%), standard pipe (up 44%), cold rolled sheets (up 13%) and heavy structural shapes (up 11%).

The year-to-date permits that reported significant increases when compared with the same period a year ago were: line pipe (up 89%), heavy structural shapes (up 74%), standard pipe (up 53%), cut lengths plates (up 47%), plates in coils (up 31%), cold rolled sheets (up 29%), tin plate (up 28%), sheets and strip galvanized hot dipped (up 26%), oil country goods (up 24%), reinforcing bars (up 22%) and hot rolled sheets (up 15%).

The countries that topped the list in terms of largest finished steel import permit applications in April this year were: South Korea (459,000 NT, down 18% from March final), China (262,000 NT down 4%), Japan (194,000 NT, up 7%), Turkey (183,000, down 55%) and Germany (123,000 NT, down 5%).

The largest offshore suppliers during the initial four-month period of the year were: South Korea (2,338,000 NT, up 49% from the same period in 2014), Turkey (1,178,000 NT, up 93%) and China (983,000, up 1%).
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis]  Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
14 hours ago
[SMM Analysis] Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
Read More
[SMM Analysis]  Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
[SMM Analysis] Valterra Platinum 2010 To 2025: How Processing Shocks and Price Cycles Reshaped the Business
Valterra Platinum’s 2010–2025 record shows how plant interruptions, inventory backlogs and changing reporting rules shaped refined output across South Africa and Zimbabwe. Platinum, palladium and rhodium followed different price cycles, so output alone could not explain value. Prices for ruthenium and iridium add context, though their separate production is undisclosed. Stronger prices and refining lifted H1 2026 results; lasting gains depend on safety, cost control and disciplined investment.
14 hours ago
[SMM Flash]  Jubilee Reviews Interest in Undeveloped Tjate PGM Project
14 hours ago
[SMM Flash] Jubilee Reviews Interest in Undeveloped Tjate PGM Project
Read More
[SMM Flash]  Jubilee Reviews Interest in Undeveloped Tjate PGM Project
[SMM Flash] Jubilee Reviews Interest in Undeveloped Tjate PGM Project
Jubilee Metals said in its 14 September operational update that several companies had expressed interest in its Tjate PGM project and that it was reviewing the approaches as part of a strategic review. Jubilee retained the South African asset after selling its other chrome and PGM operations; Miningmx reported that a disposal is under consideration as the company focuses on Zambian copper. A sale could transfer responsibility for developing Tjate. Expressions of interest are neither a sale agreement nor financing commitments, and no production timetable has been announced. Any contribution to PGM supply depends on future development decisions.
14 hours ago
[SMM Flash]  Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
14 hours ago
[SMM Flash] Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
Read More
[SMM Flash]  Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
[SMM Flash] Sylvania Reviews Thaba Plan After Lower Feed-Grade Estimates
Sylvania Platinum said in its 15 September annual results that an updated geological model indicated chrome and PGM feed grades at its Thaba joint venture could be below original assumptions. Miningmx reported estimated shortfalls of 15–20% for PGM grades and 8–12% for chrome grades against earlier targets. Sylvania’s FY2026 group output of 95,885 4E PGM oz includes operations beyond Thaba. The partners are reviewing the mine plan, with an updated life-of-mine plan expected in three to six months. Management says Thaba remains profitable under current assumptions. Lower grades could reduce recoverable metal and project returns; the revised plan and profitability outlook remain subject to that review.
14 hours ago