Newssummary: Weiqiao Group Bauxite Shipping Berth in Guinea to Open in July

Published: May 05, 2015 11:38 (GMT+8)
The first berth of the wharf project co-invested by Shandong Weiqiao Pioneering Group and three other companies is scheduled to open in July this year, cnmn.com reported.
SHANGHAI, May 5 (SMM) – The first berth of the wharf project co-invested by Shandong Weiqiao Pioneering Group and three other companies is scheduled to open in July this year, cnmn.com reported.  
 
The project aims to build two bauxite berths, one heavy cargo berth, as well as loading belts. The wharf is designed to handle 10 million tonnes per year, and annual handling capacity is expected to rise to 30 million tonnes within three years, the media added.
 
The purpose of the project is to ship bauxite mined by Boke Mining Company to China for use by Shandong Weiqiao Pioneering Group. 
 
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.  
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
37 mins ago
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
Read More
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
Altoro Metals (ASX: ARO) has reported progress in its maiden 1,400m diamond drilling program at the Guajaraz Zinc-Lead-Silver Project in central Spain. The company has completed three drill holes, with G-03 intersecting brown sphalerite veinlets that confirm zinc sulphide mineralization at depth. The program is designed to evaluate carbonate-hosted replacement-style zinc deposits and explore subparallel structures associated with the historical La Unión mine. While G-01 and G-05 remain in progress, G-05 has already encountered gneissic rock displaying intense hydrothermal alteration and low-grade mineralization. Core samples are undergoing systematic logging, with assay results expected within four to six weeks. Altoro is currently refining its drilling strategy to target high-potential zones while simultaneously progressing an application to extend the site's three-year exploration permit. Once G-01 is finalized, the company plans to redeploy one drill rig to its flagship Novales-Udías Project.
37 mins ago
Affected by LME, SHFE zinc opened lower with a gap last night [SMM Zinc Morning Comment]
53 mins ago
Affected by LME, SHFE zinc opened lower with a gap last night [SMM Zinc Morning Comment]
Read More
Affected by LME, SHFE zinc opened lower with a gap last night [SMM Zinc Morning Comment]
Affected by LME, SHFE zinc opened lower with a gap last night [SMM Zinc Morning Comment]
[SMM Zinc Morning Comment] Overnight, the most-traded SHFE zinc 2611 contract opened lower with a gap at 26,440 yuan/mt. At the beginning of the session, SHFE zinc edged down to 26,360 yuan/mt, then consolidated higher to touch a high of 26,500 yuan/mt. It consolidated around the daily average line, pulled back slightly near the close, and finally settled down at 26,435 yuan/mt.
53 mins ago
LME Structural Risks Remain, LME Zinc Maintains Fluctuating Trend [SMM Morning Meeting Summary]
55 mins ago
LME Structural Risks Remain, LME Zinc Maintains Fluctuating Trend [SMM Morning Meeting Summary]
Read More
LME Structural Risks Remain, LME Zinc Maintains Fluctuating Trend [SMM Morning Meeting Summary]
LME Structural Risks Remain, LME Zinc Maintains Fluctuating Trend [SMM Morning Meeting Summary]
[SMM Morning Meeting Summary: LME Structural Risks Remain, LME Zinc Maintains Fluctuating Trend] Overnight, LME zinc opened at $3,845/mt. In early trading, the LME zinc center moved higher, touching $3,876/mt, then gradually pulled back, dipping to $3,831.5/mt during the night session. It closed slightly higher at $3,863.5/mt, up $12.5/mt, or 0.32%. Trading volume decreased to 11,772 lots, and open interest fell by 231 lots to 263,000 lots...
55 mins ago