Newssummary: Aluminum Processing Capacity to Hit 1.5 Million Tonnes in Qinghai’s Ganhe Industrial Park in 2015

Published: Apr 07, 2015 16:03 (GMT+8)
Aluminum processing capacity in Qinghai’s Ganhe Industrial Park looks set to hit 1.5 million tonnes by the end of 2015, local media reported today.
SHANGHAI, Apr. 7 (SMM) – Aluminum processing capacity in Qinghai’s Ganhe Industrial Park looks set to hit 1.5 million tonnes by the end of 2015, local media reported today. 
 
The industrial park has attracted many aluminum processors in recent years for easy access to aluminum liquid from smelters in the park. 
  
For example, 600,000-tpy precision aluminum plate project is scheduled to reach full capacity at the end of 2016. Ground breaking will start on 5 million-piece-per-year aluminum wheel rim project and 50,000-tpy construction aluminum extrusion project soon.
 
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
  
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Caspin boosts Kelpie tin resource by 45% eyeing standalone open-pit project]
3 hours ago
[Caspin boosts Kelpie tin resource by 45% eyeing standalone open-pit project]
Read More
[Caspin boosts Kelpie tin resource by 45% eyeing standalone open-pit project]
[Caspin boosts Kelpie tin resource by 45% eyeing standalone open-pit project]
Caspin Resources (ASX: CPN) reported a 45% increase in the Mineral Resource estimate for the Kelpie tin deposit at its wholly-owned Bygoo Tin Project in New South Wales, now at 6.5 million tonnes grading 0.43% tin for 28,000 tonnes of contained tin. The resource is fully constrained within an optimised open-pit shell, includes a maiden Indicated component representing 25% of the total, and is supported by refined mining and processing parameters. This update marks a key milestone in advancing Bygoo as a potential standalone, high-grade open-pit tin development, underpinned by strong tin prices and improved confidence in the geological model. Caspin sees substantial upside from a large near-surface drilling gap, down-plunge extensions and new targets, with ongoing drilling aimed at significantly growing the resource base and strengthening project economics.
3 hours ago
[Cornish Metals opens new workshop and stores facility to advance UK South Crofty tin project]
3 hours ago
[Cornish Metals opens new workshop and stores facility to advance UK South Crofty tin project]
Read More
[Cornish Metals opens new workshop and stores facility to advance UK South Crofty tin project]
[Cornish Metals opens new workshop and stores facility to advance UK South Crofty tin project]
Cornish Metals (AIM:TIN) has opened a new workshop and stores facility to provide permanent maintenance, engineering and storage services for the South Crofty tin project in the UK, supporting the project through development and into production. The building stands on the site of the former Bartles Foundry within South Crofty's surface footprint, is covered with solar panels and will use geothermal energy recovered from mine water pumped from South Crofty, providing a lower-carbon energy source. The project was part-funded by a grant of up to 4.2 million GBP (about 7.98 million USD) from the UK Government through the UK Shared Prosperity Fund, managed by Cornwall Council; total project cost was approximately 6.8 million GBP (about 12.92 million USD). CEO Don Turvey said installation of the service winder and completion of the production winder building mark a visible shift from preparation to construction at the New Cook's Kitchen (NCK) shaft, with underground dewatering passing 400m below surface and progressing steadily. A two-hole, 2,330m surface drilling programme at Roskear has been completed; both holes intersected the known Roskear lodes at or close to predicted positions, confirming tin mineralisation continues west beyond the current resource and supporting potential resource growth. High-grade tungsten was also discovered, but tin remains the company's focus. South Crofty is a historical underground tin mine considered among the highest-grade tin resources globally, with potential to become a new low-cost global producer. Tin mining in Cornwall's Central Mining District dates back to 2,300 BC, with large-scale production from the mid-1600s until South Crofty, the last active mine, closed in 1998.
3 hours ago
【Flash | Court Ruling Eases Shutdown Risk at Young Poong’s Indium-Bearing Seokpo Smelter】
3 hours ago
【Flash | Court Ruling Eases Shutdown Risk at Young Poong’s Indium-Bearing Seokpo Smelter】
Read More
【Flash | Court Ruling Eases Shutdown Risk at Young Poong’s Indium-Bearing Seokpo Smelter】
【Flash | Court Ruling Eases Shutdown Risk at Young Poong’s Indium-Bearing Seokpo Smelter】
Young Poong Corporation disclosed on October 2 that a court of first instance had cancelled the 10-day suspension order for Seokpo Smelter, which is currently operating normally. Sales attributable to the affected operation totalled approximately KRW 1.0096 trillion in 2024, representing 36.22% of consolidated revenue. Young Poong’s official history shows that the smelter completed an indium plant in April 2012. SMM views the ruling as easing near-term disruption risk to zinc smelting and by-product indium extraction, although any appeal and the indium plant’s actual operating rate and output require further monitoring.
3 hours ago