SMM Base Metals Weekly Price Review and Forecast (Mar. 16-20, 2015)

Published: Mar 18, 2015 09:46
Chinese shares showed big swings last week and ended with a 3% gain.

SHANGHAI, Mar. 17 (SMM) –

Although China’s economic data released last week were disappointing, Remarks of PBOC’s governor Zhou Xiaochuan at a press conference cheered up the market. In the euro zone, economic signposts remained weak and the risk of a Greek default increased, pushing the euro to a 12-year low. That, combined with anticipation for Fed’s interest rate increase, drove the US dollar index to 100. Crude oil and gold were relatively firm.

SMMI.Al increased 1%, and SMMI.Cu posted a 0.71% rise laset week. SMMI.Pb edged up 0.42%, while SMMI.Zn dropped 0.96%. SMMI.Sn fell by 1.19% partly dragged by the 5% slump in LME tin. SMMI.Ni dropped 0.68%. SMMI rallied after initial falls and ended last week up 0.37%.

Copper
Chinese shares showed big swings last week and ended with a 3% gain. SHFE copper prices moved between RMB 41,800-42,800/mt, and both trading volumes and positions remained stable. SHFE copper may thus test resistance at RMB 43,300/mt.

In China’s spot copper market, cargo holders held prices firm. Dealers entered market to source lower-priced goods, and the price spread between standard and high-quality copper narrowed.

Aluminum
SHFE 1505 aluminum contract dropped to RMB 12,865/mt, but rallied to RMB 13,290/mt later in the week. Many investors exited the market, leaving the most active contract hovering around RMB 13,000/mt. In China’s spot market, inventories kept growing, but sellers did not panic. Processors sought cheap goods. Spot prices gained less than SHFE aluminum, causing spot discounts to expand.

Improving market sentiment will push SHFE 1505 aluminum contract up further, but poor market fundamentals will temper gains, with prices expected between RMB 13,000-13,200/mt this week. In China’s spot market, higher prices will cool buying. Spot aluminum should trade at discounts of RMB 170-220/mt over SHFE front-month contract.

Lead
SHFE 1505 lead contract underperformed LME lead at the beginning of last week and moved at RMB 12,200-12,300/mt, but started rising on Wednesday to climb above RMB 12,300/mt. SHFE 1505 lead contract prices are expected at RMB 12,300-12,450/mt and test resistance at RMB 12,450/mt.

Spot lead trading in China showed some improvement last week. Limited supply of branded goods in Shanghai left prices in the region RMB 100/mt higher than those in Henan. Thus, some downstream buyers preferred to purchase from Henan. However, tight cash supply and sizeable inventories prevented downstream producers from buying in large amounts.

Zinc
In Shanghai’s spot market, spot premiums of #0 zinc against SHFE 1505 zinc contract prices narrowed from RMB 30-90/mt to zero. Inventories at smelters were high. When combined with a large influx of imported zinc and selloffs by traders, supply was ample. Demand also improved, causing trading to grow. Discounts on #0 zinc price in Tianjin over Shanghai price contracted from RMB 140/mt to RMB 40/mt. Some smelters held back goods on falling zinc prices, which in turn bolstered zinc prices. Downstream galvanizers purchased modestly on low operating rates and falling zinc prices.

Discounts on #0 zinc price in Guangdong against Shanghai prices narrowed from RMB 50-60/mt to RMB 20-30/mt. Guangdong’s inventories stabilized. But large shipments arriving after the Chinese New Year holiday add to supply, which weighed on spot premiums/discounts against SHFE 1505 zinc contract prices. Trading was brisk early last week as downstream buyers purchased at lower prices, but weakened in the latter half of the week.

Few deliveries are expected in China’s spot markets this week, but a large inflow of imported zinc, combined with ample supply from smelters, will leave supply healthy. Downstream buyers, though, remain bearish towards near-term zinc prices, so are buying to need despite their own rising operating rates. Spot discounts against SHFE 1505 zinc contract prices should widen to RMB 100/mt.

Tin
Tin prices in Shanghai spot market were stable between RMB 122,000-125,000/mt last Monday, but fell to RMB 121,500-124,500/mt the next day as a USD 325/mt decline in LME tin turned market players in domestic market bearish. Prices dropped further to RMB 121,000-124,000/mt later in the week after LME tin retreated from USD 17,600/mt.

Nickel
SMM #1 spot nickel prices averaged RMB 104,240/mt last week, down by RMB 510/mt on a weekly basis. Transactions between traders picked up, while downstream producers were cautious towards purchases. Jinchuan Group cut prices twice last week by RMB 500/mt to RMB 104,500/mt.

The number of imported nickel entering Chinese market this week will remain limited, but Jinchuan Group will increase supply. Meanwhile, downstream demand is unlikely to improve. Thus, spot nickel prices will be RMB 103,500-106,500/mt.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
14 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
14 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
17 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
17 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
17 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
17 hours ago